IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0174 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,810 $6,000 Not Implemented
DL0174 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,550 $8,000 Not Implemented
DL0174 # 05 Y:2017 05 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $5,100 $10,000 Not Implemented
DL0174 # 06 Y:2017 06 2017 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $10,800 $0 Not Implemented
DL0174 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,500 $25,000 Not Implemented
DL0174 # 08 Y:2017 08 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $630 $2,000 Not Implemented
DL0174 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,220 $34,080 Not Implemented
MZ0223 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,108 $43,540 Implemented
MZ0223 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $7,340 $2,435 Implemented
MZ0223 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,416 $1,428 Implemented
MZ0223 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,067 $925 Implemented
GT0896 # 01 Y:2017 01 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,852 $90,000 Not Implemented
GT0896 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,487 $3,000 Not Implemented
GT0896 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,122 $35,484 Implemented
GT0896 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $438 $300 Not Implemented
GT0896 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,749 $6,180 Implemented
GT0896 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $91,181 $355,605 Not Implemented
IP0083 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,016 $5 Implemented
IP0083 # 02 Y:2017 02 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $15,779 $5 Not Implemented
IP0083 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,290 $0 Implemented
IP0083 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,706 $0 Implemented
IP0083 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $20,472 $1,434 Not Implemented
IP0083 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,077 $1,296 Implemented
IP0083 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $13,276 $7,860 Implemented
IP0083 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,581 $23,044 Implemented