Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0174 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,810 | $6,000 | Not Implemented |
DL0174 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,550 | $8,000 | Not Implemented |
DL0174 # 05 Y:2017 | 05 | 2017 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $5,100 | $10,000 | Not Implemented |
DL0174 # 06 Y:2017 | 06 | 2017 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $10,800 | $0 | Not Implemented |
DL0174 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,500 | $25,000 | Not Implemented |
DL0174 # 08 Y:2017 | 08 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $630 | $2,000 | Not Implemented |
DL0174 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,220 | $34,080 | Not Implemented |
MZ0223 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,108 | $43,540 | Implemented |
MZ0223 # 02 Y:2017 | 02 | 2017 | INSULATE BARE EQUIPMENT | $7,340 | $2,435 | Implemented |
MZ0223 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,416 | $1,428 | Implemented |
MZ0223 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,067 | $925 | Implemented |
GT0896 # 01 Y:2017 | 01 | 2017 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,852 | $90,000 | Not Implemented |
GT0896 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,487 | $3,000 | Not Implemented |
GT0896 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,122 | $35,484 | Implemented |
GT0896 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $438 | $300 | Not Implemented |
GT0896 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,749 | $6,180 | Implemented |
GT0896 # 06 Y:2017 | 06 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $91,181 | $355,605 | Not Implemented |
IP0083 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,016 | $5 | Implemented |
IP0083 # 02 Y:2017 | 02 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $15,779 | $5 | Not Implemented |
IP0083 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,290 | $0 | Implemented |
IP0083 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,706 | $0 | Implemented |
IP0083 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,472 | $1,434 | Not Implemented |
IP0083 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,077 | $1,296 | Implemented |
IP0083 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $13,276 | $7,860 | Implemented |
IP0083 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,581 | $23,044 | Implemented |