IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0375 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,382 $83,840 Implemented
WV0375 # 07 Y:2008 07 2008 USE RADIANT HEATER FOR SPOT HEATING $23,729 $37,200 Not Implemented
WV0375 # 08 Y:2008 08 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $59,537 $62,535 Not Implemented
WV0375 # 09 Y:2008 09 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $57,494 $25,520 Not Implemented
WV0375 # 10 Y:2008 10 2008 RECOVER WASTE HEAT FROM EQUIPMENT $34,143 $15,525 Not Implemented
WV0375 # 11 Y:2008 11 2008 USE OPTIMUM THICKNESS INSULATION $33,427 $6,567 Implemented
WV0375 # 12 Y:2008 12 2008 DEVELOP A REPAIR/REPLACE POLICY $32,477 $1,338 Implemented
WV0375 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,817 $2,000 Implemented
WV0375 # 14 Y:2008 14 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,983 $772 Implemented
WV0375 # 15 Y:2008 15 2008 UPGRADE CONTROLS ON COMPRESSORS $7,595 $4,650 Not Implemented
WV0375 # 16 Y:2008 16 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,374 $52 Implemented
WV0375 # 17 Y:2008 17 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,975 $652 Not Implemented
WV0375 # 18 Y:2008 18 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,797 $10,125 Implemented
WV0375 # 19 Y:2008 19 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,275 $0 Not Implemented
MS0325 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,471 $24,719 Implemented
MS0325 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $9,208 $156 Implemented
MS0325 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,992 $8,100 Not Implemented
MS0325 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,031 $7,308 Not Implemented
MS0325 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,772 $236 Not Implemented
MS0325 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $411 $1,800 Implemented
MS0325 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $1,050 Implemented
IA0420 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,339 $900 Not Implemented
IA0420 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,062 $1,000 Not Implemented
IA0420 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,179 $25 Not Implemented
IA0420 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $19,446 $1,000 Not Implemented