Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0375 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $82,382 | $83,840 | Implemented |
WV0375 # 07 Y:2008 | 07 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $23,729 | $37,200 | Not Implemented |
WV0375 # 08 Y:2008 | 08 | 2008 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $59,537 | $62,535 | Not Implemented |
WV0375 # 09 Y:2008 | 09 | 2008 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $57,494 | $25,520 | Not Implemented |
WV0375 # 10 Y:2008 | 10 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $34,143 | $15,525 | Not Implemented |
WV0375 # 11 Y:2008 | 11 | 2008 | USE OPTIMUM THICKNESS INSULATION | $33,427 | $6,567 | Implemented |
WV0375 # 12 Y:2008 | 12 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $32,477 | $1,338 | Implemented |
WV0375 # 13 Y:2008 | 13 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $29,817 | $2,000 | Implemented |
WV0375 # 14 Y:2008 | 14 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,983 | $772 | Implemented |
WV0375 # 15 Y:2008 | 15 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $7,595 | $4,650 | Not Implemented |
WV0375 # 16 Y:2008 | 16 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,374 | $52 | Implemented |
WV0375 # 17 Y:2008 | 17 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,975 | $652 | Not Implemented |
WV0375 # 18 Y:2008 | 18 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,797 | $10,125 | Implemented |
WV0375 # 19 Y:2008 | 19 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,275 | $0 | Not Implemented |
MS0325 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,471 | $24,719 | Implemented |
MS0325 # 02 Y:2008 | 02 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $9,208 | $156 | Implemented |
MS0325 # 03 Y:2008 | 03 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,992 | $8,100 | Not Implemented |
MS0325 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,031 | $7,308 | Not Implemented |
MS0325 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,772 | $236 | Not Implemented |
MS0325 # 06 Y:2008 | 06 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $411 | $1,800 | Implemented |
MS0325 # 07 Y:2008 | 07 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $318 | $1,050 | Implemented |
IA0420 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,339 | $900 | Not Implemented |
IA0420 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,062 | $1,000 | Not Implemented |
IA0420 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,179 | $25 | Not Implemented |
IA0420 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,446 | $1,000 | Not Implemented |