Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,731
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0002 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $954 | $0 | n/a |
CC0002 # 04 Y:2022 | 04 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $106 | $180 | n/a |
OR0751 # 01 Y:2022 | 01 | 2022 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $12,526 | $140 | Not Implemented |
OR0751 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,956 | $1,175 | Not Implemented |
OR0751 # 03 Y:2022 | 03 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $74,774 | $48,589 | Not Implemented |
OR0751 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,125 | $1,272 | Not Implemented |
UD1037 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,459 | $0 | Not Implemented |
UD1037 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,378 | $0 | Not Implemented |
UD1037 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,323 | $0 | Implemented |
UD1037 # 04 Y:2022 | 04 | 2022 | INSTALL AUTOMATIC STACK DAMPER | $4,890 | $2,000 | Not Implemented |
UD1037 # 05 Y:2022 | 05 | 2022 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $26,903 | $30,000 | Not Implemented |
UD1037 # 06 Y:2022 | 06 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $657 | $1,500 | Not Implemented |
UD1037 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,245 | $0 | Not Implemented |
UD1037 # 08 Y:2022 | 08 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,275 | $14,400 | Implemented |
UD1037 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,006 | $6,975 | Implemented |
CW0122 # 01 Y:2022 | 01 | 2022 | TREAT AND REUSE RINSE WATERS | $11,974 | $2,500 | n/a |
CW0122 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,767 | $400 | n/a |
CW0122 # 03 Y:2022 | 03 | 2022 | CONVERT TO ROBOTIC PAINTING | $102,960 | $48,500 | n/a |
CW0122 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $25,171 | $73,990 | n/a |
CW0122 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $13,037 | $60,000 | n/a |
CW0122 # 06 Y:2022 | 06 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $42,376 | $188,648 | n/a |
DL0204 # 01 Y:2022 | 01 | 2022 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $18,234 | $0 | Not Implemented |
DL0204 # 02 Y:2022 | 02 | 2022 | USE OPTIMUM TEMPERATURE | $1,182 | $0 | Implemented |
DL0204 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $491 | $45 | Implemented |
DL0204 # 04 Y:2022 | 04 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $32,583 | $1,300 | Not Implemented |