Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0215 # 04 Y:2012 | 04 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,640 | $12,200 | Not Implemented |
MI0215 # 05 Y:2012 | 05 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,815 | $1,300 | Implemented |
MI0215 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,514 | $50 | Not Implemented |
MI0215 # 07 Y:2012 | 07 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $625 | $4,571 | Not Implemented |
UF0452 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $11,846 | $20,077 | Not Implemented |
UF0452 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,308 | $0 | Not Implemented |
UF0452 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,797 | $8,904 | Not Implemented |
UF0452 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,408 | $0 | Not Implemented |
UF0452 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,387 | $7,579 | Not Implemented |
MI0214 # 01 Y:2012 | 01 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,941 | $50,000 | Not Implemented |
MI0214 # 02 Y:2012 | 02 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,740 | $2,600 | Implemented |
MI0214 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $986 | $1,320 | Implemented |
MI0214 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $976 | $1,505 | Not Implemented |
MI0214 # 05 Y:2012 | 05 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $948 | $1,058 | Implemented |
MI0214 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $564 | $1,860 | Not Implemented |
UF0451 # 01 Y:2011 | 01 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,739 | $0 | Implemented |
UF0451 # 02 Y:2011 | 02 | 2011 | INSTALL COMMON HEADER ON COMPRESSORS | $8,773 | $222 | Implemented |
UF0451 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,497 | $0 | Not Implemented |
UF0451 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,153 | $1,277 | Implemented |
UF0451 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,440 | $3,310 | Implemented |
UF0451 # 06 Y:2011 | 06 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $498 | $0 | Implemented |
UF0451 # 07 Y:2011 | 07 | 2011 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $1,379 | $1,140 | Not Implemented |
UF0451 # 08 Y:2011 | 08 | 2011 | USE OPTIMUM THICKNESS INSULATION | $1,327 | $1,865 | Not Implemented |
UF0450 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,683 | $0 | Not Implemented |
UF0450 # 02 Y:2011 | 02 | 2011 | INSTALL COMMON HEADER ON COMPRESSORS | $1,378 | $511 | Not Implemented |