IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0369 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $918 $750 Not Implemented
KU0369 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,856 $125 Implemented
KU0369 # 08 Y:1992 08 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,147 $0 Not Implemented
TN0458 # 01 Y:1992 01 1992 OPERATE BOILERS ON HIGH FIRE SETTING $4,410 $15,000 Not Implemented
TN0458 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,619 $570 Not Implemented
TN0458 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,853 $3,390 Not Implemented
TN0458 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $348 $25 Not Implemented
TN0459 # 01 Y:1992 01 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $34,394 $2,080 Not Implemented
TN0459 # 02 Y:1992 02 1992 KEEP LAMPS AND REFLECTORS CLEAN $12,579 $26,162 Not Implemented
TN0459 # 03 Y:1992 03 1992 INSTALL TIMERS AND/OR THERMOSTATS $7,264 $5,670 Not Implemented
TN0459 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,390 $538 Not Implemented
TN0459 # 05 Y:1992 05 1992 INSULATE BARE EQUIPMENT $1,001 $247 Not Implemented
TN0459 # 06 Y:1992 06 1992 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $463 $885 Not Implemented
GT0460 # 01 Y:1992 01 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $934 $150 Implemented
GT0460 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,100 $8,510 Implemented
GT0460 # 03 Y:1992 03 1992 DISCONNECT BALLASTS $136 $50 Implemented
GT0460 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $465 $6,040 Implemented
GT0460 # 05 Y:1992 05 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $85 $0 Implemented
GT0460 # 06 Y:1992 06 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,920 $18,300 Implemented
GT0460 # 07 Y:1992 07 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $109 $0 Implemented
GT0461 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,414 $300 Implemented
GT0461 # 02 Y:1992 02 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,427 $10,500 Implemented
GT0461 # 03 Y:1992 03 1992 REPAIR AND ELIMINATE STEAM LEAKS $5,200 $1,000 Implemented
GT0461 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $13,398 $7,605 Implemented
GT0461 # 05 Y:1992 05 1992 USE MINIMUM STEAM OPERATING PRESSURE $499 $0 Implemented