IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0148 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,483 $49 Implemented
IA0148 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $280 $582 Not Implemented
IA0148 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $1,160 Implemented
IA0148 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $469 $77 Implemented
IA0148 # 07 Y:1996 07 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $732 $125 Not Implemented
IA0148 # 08 Y:1996 08 1996 MODIFY MATERIAL APPLICATION METHODS $299 $22 Implemented
NV0058 # 01 Y:1996 01 1996 INSULATE BARE EQUIPMENT $3,660 $1,960 Not Implemented
NV0058 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,987 $700 Not Implemented
NV0058 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $632 $170 Not Implemented
NV0058 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $1,338 $227 Implemented
NV0058 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $3,197 $600 Implemented
NV0058 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $711 $900 Not Implemented
MA0366 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,638 $0 Not Implemented
MA0366 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $11,369 $9,450 Implemented
MA0366 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,893 $20,255 Not Implemented
MA0366 # 04 Y:1996 04 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,919 $9,000 Not Implemented
MA0366 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,474 $350 Implemented
MA0366 # 06 Y:1996 06 1996 RECOVER AND REUSE COOLING WATER $1,421 $1,471 Not Implemented
MA0366 # 07 Y:1996 07 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,093 $4,910 Not Implemented
MA0366 # 08 Y:1996 08 1996 UTILIZE A LESS EXPENSIVE COOLING METHOD $435 $250 Not Implemented
ME0196 # 01 Y:1996 01 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,928 $0 Implemented
ME0196 # 02 Y:1996 02 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,757 $0 Not Implemented
ME0196 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,035 $9,015 Implemented
ME0196 # 04 Y:1996 04 1996 PAY UTILITY BILLS ON TIME $628 $0 Implemented
ME0196 # 05 Y:1996 05 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $626 $1,075 Implemented