IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0312 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,170 $1,559 Not Implemented
MS0312 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,372 $135 Not Implemented
MS0312 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $551 $4,911 Not Implemented
IC0125 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $202,850 $475,200 Not Implemented
IC0125 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $305,019 $900,000 Not Implemented
IC0125 # 03 Y:2007 03 2007 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $227,690 $372,000 Not Implemented
IC0125 # 04 Y:2007 04 2007 USE MINIMUM STEAM OPERATING PRESSURE $611 $0 Implemented
IC0125 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,000 $0 Not Implemented
IC0125 # 06 Y:2007 06 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,910 $4,260 Not Implemented
IC0125 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $4,800 Implemented
IC0125 # 08 Y:2007 08 2007 UPGRADE CONTROLS ON COMPRESSORS $12,731 $18,755 Not Implemented
IC0125 # 09 Y:2007 09 2007 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $52,577 $43,780 Implemented
IC0125 # 10 Y:2007 10 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,975 $14,767 Not Implemented
IC0125 # 11 Y:2007 11 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,961 $16,278 Implemented
IC0125 # 12 Y:2007 12 2007 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,563 $0 Implemented
SU0250 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $12,666 $0 Not Implemented
SU0250 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $696 $0 Implemented
SU0250 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $0 Implemented
SU0250 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $82 $0 Implemented
SU0250 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,654 $425 Implemented
SU0250 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,593 $191 Not Implemented
SU0250 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,133 $587 Implemented
SU0250 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,717 $348 Not Implemented
SU0250 # 09 Y:2007 09 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,604 $3,502 Implemented
SU0250 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $727 $519 Implemented