IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,750

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0608 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,789 $7,200 Implemented
UF0608 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $1,138 $5,400 Implemented
UF0607 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $173,293 $118,890 Implemented
UF0607 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122,669 $11,700 Implemented
UF0607 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $94,496 $322,608 Implemented
UF0607 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $36,207 $25,350 Not Implemented
UF0607 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,683 $0 Implemented
UF0607 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $183,418 $60,000 Not Implemented
MI0436 # 01 Y:2023 01 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $3,141,406 $1,000,000 Implemented
MI0436 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,029 $480 Implemented
MI0436 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,894 $1,980 Implemented
MI0436 # 04 Y:2023 04 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,903 $1,827 Implemented
MI0436 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,785 $13,440 Implemented
MI0436 # 06 Y:2023 06 2023 AIR CONDITION ONLY SPACE NECESSARY $3,663 $3,360 Implemented
MI0436 # 07 Y:2023 07 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,508 $0 Implemented
MI0436 # 08 Y:2023 08 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,021 $199 Implemented
MI0436 # 09 Y:2023 09 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,045 $0 Implemented
UF0606 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $188,564 $146,067 Implemented
UF0606 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,322 $322,608 Implemented
UF0606 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,799 $79,800 Implemented
UF0606 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,430 $25,350 Implemented
UF0606 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,283 $0 Implemented
UF0606 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $214,485 $60,000 Not Implemented
UF0605 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $108,422 $322,608 Not Implemented
UF0605 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,052 $10,000 Implemented