IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0214 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $1,558 Implemented
UU0214 # 07 Y:2023 07 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $24,046 $226,100 Not Implemented
UU0214 # 08 Y:2023 08 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $23,820 $214,625 Not Implemented
UU0212 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,149 $8,500 Not Implemented
UU0212 # 02 Y:2023 02 2023 REPLACE BOILER $11,580 $80,000 Not Implemented
UU0212 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,326 $21,555 Not Implemented
UU0212 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Not Implemented
UU0212 # 05 Y:2023 05 2023 USE OPTIMUM THICKNESS INSULATION $4,220 $4,402 Not Implemented
UU0212 # 06 Y:2023 06 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $425 $850 Not Implemented
UU0212 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $382 $1,370 Not Implemented
UU0213 # 01 Y:2023 01 2023 USE POWER DURING OFF-PEAK PERIODS $7,487 $8,000 Not Implemented
UU0213 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $5,181 $18,250 Not Implemented
UU0213 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,602 $1,773 Not Implemented
UU0213 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $1,190 $3,000 Not Implemented
UU0213 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $639 $1,950 Not Implemented
UU0211 # 01 Y:2023 01 2023 REPLACE BOILER $24,600 $111,300 Implemented
UU0211 # 02 Y:2023 02 2023 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,030 $18,300 Not Implemented
UU0211 # 03 Y:2023 03 2023 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $7,263 $12,600 Not Implemented
UU0211 # 04 Y:2023 04 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,351 $26,250 Implemented
UU0211 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $2,330 $6,230 Not Implemented
UU0211 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $433 $3,100 Not Implemented
UU0210 # 01 Y:2023 01 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,345 $2,500 Implemented
UU0210 # 02 Y:2023 02 2023 AIR CONDITION ONLY SPACE NECESSARY $8,161 $100 Implemented
UU0210 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,954 $9,928 Implemented
UU0210 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $3,114 $6,718 Not Implemented