IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0534 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $1,690 $6,230 Not Implemented
CO0534 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,520 $1,070 Not Implemented
CO0534 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,171 $656 Not Implemented
CO0534 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $980 $2,750 Not Implemented
CO0534 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $710 $620 Not Implemented
MS0238 # 01 Y:2003 01 2003 INSTALL TIMERS AND/OR THERMOSTATS $20,406 $3,978 n/a
MS0238 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $5,078 $2,198 n/a
MS0238 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,933 $782 n/a
MS0238 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $3,020 $3,187 n/a
MS0238 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $2,190 $3,375 n/a
MS0238 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,943 $1,920 n/a
MS0238 # 07 Y:2003 07 2003 SHUT OFF PILOTS IN STANDBY EQUIPMENT $1,069 $250 n/a
MS0238 # 08 Y:2003 08 2003 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $728 $312 n/a
NC0271 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,523 $50 Implemented
NC0271 # 02 Y:2003 02 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,935 $4,065 Not Implemented
NC0271 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,792 $27,000 Not Implemented
NC0271 # 04 Y:2003 04 2003 ADOPT IN-HOUSE MATERIAL GENERATION $56,248 $120,000 Not Implemented
NC0271 # 05 Y:2003 05 2003 DEVELOP A REPAIR/REPLACE POLICY $204 $150 Implemented
NC0271 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $796 $100 Implemented
UU0056 # 01 Y:2003 01 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $335 $1,600 Not Implemented
UU0056 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $121 Implemented
UU0056 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $244 $58 Implemented
UU0056 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $136 Not Implemented
UU0056 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $266 Not Implemented
UU0056 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $110 $490 Implemented