IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0001 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $113 $65 Not Implemented
UF0001 # 05 Y:1991 05 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,105 $0 Not Implemented
UF0001 # 06 Y:1991 06 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $11,150 $7,166 Not Implemented
OK0334 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,555 $0 Not Implemented
OK0334 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,330 $1,330 Not Implemented
OK0334 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,612 $56,631 Not Implemented
OK0334 # 04 Y:1991 04 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $50,672 $0 Not Implemented
OK0334 # 05 Y:1991 05 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $153,237 $0 Not Implemented
OK0334 # 06 Y:1991 06 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,547 $0 Not Implemented
OK0335 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $0 Implemented
OK0335 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,787 $1,500 Implemented
OK0335 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $78 Implemented
OK0335 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $162 $395 Implemented
MA0205 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,259 $13,297 Implemented
MA0205 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $2,448 $161 Implemented
MA0205 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $7,115 $4,000 Implemented
MA0205 # 04 Y:1991 04 1991 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $15,928 $0 Implemented
MA0205 # 05 Y:1991 05 1991 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $614 $897 Implemented
MA0205 # 06 Y:1991 06 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,637 $0 Implemented
MO0019 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $7,812 $1,907 Not Implemented
MO0019 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $749 Not Implemented
MO0019 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,883 $564 Not Implemented
MO0019 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,233 $340 Not Implemented
MO0019 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $877 $20 Not Implemented
MO0019 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $455 $995 Not Implemented