IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0335 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $0 Implemented
OK0335 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,787 $1,500 Implemented
OK0335 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $78 Implemented
OK0335 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $162 $395 Implemented
OR0109 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $1,432 $1,506 Not Implemented
MA0205 # 04 Y:1991 04 1991 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $15,928 $0 Implemented
MA0205 # 05 Y:1991 05 1991 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $614 $897 Implemented
MA0205 # 06 Y:1991 06 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,637 $0 Implemented
MO0019 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $7,812 $1,907 Not Implemented
MO0019 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $749 Not Implemented
MO0019 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,883 $564 Not Implemented
MO0019 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,233 $340 Not Implemented
MO0019 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $877 $20 Not Implemented
MO0019 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $455 $995 Not Implemented
KU0334 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,153 $1,800 Implemented
KU0334 # 02 Y:1991 02 1991 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $336 $40 Implemented
KU0334 # 03 Y:1991 03 1991 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $22,062 $33,150 Implemented
KU0334 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,034 $4,200 Implemented
KU0334 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $6,382 $0 Implemented
KU0334 # 06 Y:1991 06 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,054 $16,950 Implemented
KU0334 # 07 Y:1991 07 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,665 $22,600 Implemented
KU0334 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $454 $120 Implemented
MA0205 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,259 $13,297 Implemented
MA0205 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $2,448 $161 Implemented
MA0205 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $7,115 $4,000 Implemented