Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,091
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0001 # 04 Y:1991 | 04 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $113 | $65 | Not Implemented |
UF0001 # 05 Y:1991 | 05 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,105 | $0 | Not Implemented |
UF0001 # 06 Y:1991 | 06 | 1991 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $11,150 | $7,166 | Not Implemented |
OK0334 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,555 | $0 | Not Implemented |
OK0334 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,330 | $1,330 | Not Implemented |
OK0334 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,612 | $56,631 | Not Implemented |
OK0334 # 04 Y:1991 | 04 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $50,672 | $0 | Not Implemented |
OK0334 # 05 Y:1991 | 05 | 1991 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $153,237 | $0 | Not Implemented |
OK0334 # 06 Y:1991 | 06 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,547 | $0 | Not Implemented |
OK0335 # 01 Y:1991 | 01 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,200 | $0 | Implemented |
OK0335 # 02 Y:1991 | 02 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $1,787 | $1,500 | Implemented |
OK0335 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197 | $78 | Implemented |
OK0335 # 04 Y:1991 | 04 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $162 | $395 | Implemented |
MA0205 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,259 | $13,297 | Implemented |
MA0205 # 02 Y:1991 | 02 | 1991 | INSTALL SET-BACK TIMERS | $2,448 | $161 | Implemented |
MA0205 # 03 Y:1991 | 03 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $7,115 | $4,000 | Implemented |
MA0205 # 04 Y:1991 | 04 | 1991 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $15,928 | $0 | Implemented |
MA0205 # 05 Y:1991 | 05 | 1991 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $614 | $897 | Implemented |
MA0205 # 06 Y:1991 | 06 | 1991 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,637 | $0 | Implemented |
MO0019 # 01 Y:1991 | 01 | 1991 | INSULATE BARE EQUIPMENT | $7,812 | $1,907 | Not Implemented |
MO0019 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $720 | $749 | Not Implemented |
MO0019 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,883 | $564 | Not Implemented |
MO0019 # 04 Y:1991 | 04 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,233 | $340 | Not Implemented |
MO0019 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $877 | $20 | Not Implemented |
MO0019 # 06 Y:1991 | 06 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $455 | $995 | Not Implemented |