IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0160 # 06 Y:1997 06 1997 PURCHASE EQUIPMENT INSTEAD OF LEASING $55,900 $15,000 Implemented
HO0160 # 07 Y:1997 07 1997 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,250 $300 Not Implemented
IA0167 # 01 Y:1997 01 1997 CONVERT TO ELECTROSTATIC POWDER COATING $111,000 $7,800 Implemented
IA0167 # 02 Y:1997 02 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,790 $71,000 Implemented
IA0167 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,635 $18,214 Not Implemented
IA0167 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,537 $36,506 Not Implemented
IA0167 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,493 $1,484 Not Implemented
IA0167 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $204 Implemented
IA0167 # 07 Y:1997 07 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,120 $25 Not Implemented
IA0167 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $263 $500 Implemented
KG0096 # 01 Y:1997 01 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,652 $150 n/a
KG0096 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,179 $425 n/a
KG0096 # 03 Y:1997 03 1997 MODERATE COOLING TOWER OUTLET TEMPERATURE $660 $60 n/a
KG0096 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $141 $300 n/a
KG0096 # 05 Y:1997 05 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $2,250 $500 n/a
KG0096 # 06 Y:1997 06 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,228 $0 n/a
MS0089 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $6,352 $9,450 n/a
MS0089 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,136 $49,751 n/a
MS0089 # 03 Y:1997 03 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,339 $58,400 n/a
MS0089 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,921 $1,000 n/a
MS0089 # 05 Y:1997 05 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $480 $0 n/a
MS0089 # 06 Y:1997 06 1997 ELIMINATE SHIFT $139,776 $0 n/a
ME0223 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,319 $8,303 Implemented
ME0223 # 02 Y:1997 02 1997 PURCHASE EQUIPMENT INSTEAD OF LEASING $1,356 $2,300 Implemented
ME0223 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,066 $650 Not Implemented