IAC logo
IAC Assessment: HO0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Vacuum Cleaner Bags
NAICS n/a
SIC 2674 - Bags: Uncoated Paper & Multiwall
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 110,000
Annual Production 75,000,000 Pounds
Production Hrs. Annual 4,680
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,770 1,649,179 kWh $0.09
Electricity Demand $45,816 4,592 kW-months/year $9.98
Electricity Fees $24,950 - $ -
Natural Gas $114,301 13,840 MMBtu $8.26
TOTAL ENERGY COSTS $558,837
RECOMMENDED SAVINGS* $83,332 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,900
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,846
Cost:
$18,908
$7,691 84,994 $2,155 216 - - - - $7,691
84,994
kWh
$2,155
216
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,510
Cost:
$1,021
$1,510 16,706 - - - - - - $1,510
16,706
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,379
Cost:
$3,500
- - $5,379 539 - - - - -
-
kWh
$5,379
539
kW-months/year
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,433
Cost:
$800
$1,122 12,309 $311 31 - - - - $1,122
12,309
kWh
$311
31
kW-months/year
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,014
Cost:
$100
$4,685 51,876 $1,329 133 - - - - $4,685
51,876
kWh
$1,329
133
kW-months/year
-
-
lb
-
-
$
06: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$55,900
Cost:
$15,000
- - - - - - $55,900 - -
-
kWh
-
-
kW-months/year
-
-
lb
$55,900
-
$
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$3,250
Cost:
$300
- - - - $3,250 750 - - -
-
kWh
-
-
kW-months/year
$3,250
750
lb
-
-
$
TOTAL RECOMMENDED Savings:
$83,332
Cost:
$39,629
$15,008 165,885 $9,174 919 $3,250 750 $55,900 - $15,008
165,885
kWh
$9,174
919
kW-months/year
$3,250
750
lb
$55,900
-
$
TOTAL IMPLEMENTED Savings:
$55,900
Cost:
$15,000
- - - - - - $55,900 - -
-
kWh
-
-
kW-months/year
-
-
lb
$55,900
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes