IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0287 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,661 $225 Implemented
BD0287 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,900 $150 Implemented
BD0287 # 07 Y:2005 07 2005 INSTALL TURBULATORS $1,486 $2,500 Not Implemented
BD0287 # 08 Y:2005 08 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $146 $0 Implemented
BD0287 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $894 $2,500 Implemented
BD0287 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented
BD0287 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $568 $440 Not Implemented
BD0287 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $564 $600 Implemented
BD0287 # 13 Y:2005 13 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $140 Implemented
GT0807 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,729 $25,590 Implemented
GT0807 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $719 $663 Implemented
GT0807 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $1,135 $543 Implemented
GT0807 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $427 $120 Implemented
GT0807 # 05 Y:2005 05 2005 COMBINE UTILITY METERS $3,880 $8,000 Not Implemented
GT0807 # 06 Y:2005 06 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,540 $1,120 Not Implemented
GT0807 # 07 Y:2005 07 2005 METER WASTE WATER $7,200 $550 Not Implemented
GT0807 # 08 Y:2005 08 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $497 $1,300 Implemented
GT0807 # 09 Y:2005 09 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,762 $50,525 Not Implemented
AM0491 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $20,300 $56,420 Implemented
AM0491 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $8,990 $684 Implemented
AM0491 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $2,720 $0 Implemented
AM0491 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $380 $0 Implemented
WI0492 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,385 $25,200 Implemented
WI0492 # 02 Y:2005 02 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $10,448 $8,000 Not Implemented
WI0492 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,782 $4,300 Not Implemented