Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0337 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,180 | $18,000 | Implemented |
NC0337 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $723 | $723 | Implemented |
NC0337 # 05 Y:2006 | 05 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $10,650 | $5,000 | Not Implemented |
NC0337 # 06 Y:2006 | 06 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,350 | $3,430 | Not Implemented |
NC0337 # 07 Y:2006 | 07 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $23,249 | $11,746 | Not Implemented |
NC0337 # 08 Y:2006 | 08 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,069 | $19,441 | Not Implemented |
NC0337 # 09 Y:2006 | 09 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,941 | $0 | Not Implemented |
NC0337 # 10 Y:2006 | 10 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $846 | $700 | Implemented |
NC0337 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,266 | $3,139 | Implemented |
NC0337 # 12 Y:2006 | 12 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,986 | $50 | Implemented |
NC0337 # 13 Y:2006 | 13 | 2006 | ADD AREA LIGHTING SWITCHES | $524 | $1,200 | Not Implemented |
NC0337 # 14 Y:2006 | 14 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,138 | $200 | Not Implemented |
MI0128 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $78,238 | $4,445 | Not Implemented |
MI0128 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,974 | $5,000 | Not Implemented |
MI0128 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,372 | $31,540 | Implemented |
MI0128 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,248 | $1,750 | Not Implemented |
MI0128 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,703 | $1,074 | Implemented |
MI0128 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,762 | $4,800 | Not Implemented |
MI0128 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,984 | $30 | Implemented |
AM0507 # 01 Y:2006 | 01 | 2006 | COMBINE UTILITY METERS | $71,000 | $100,000 | Implemented |
AM0507 # 02 Y:2006 | 02 | 2006 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $37,900 | $600 | Implemented |
AM0507 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $22,000 | $51,000 | Not Implemented |
AM0507 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $13,750 | $2,100 | Implemented |
AM0507 # 05 Y:2006 | 05 | 2006 | USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) | $7,616 | $25,000 | Not Implemented |
AM0507 # 06 Y:2006 | 06 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,000 | $500 | Implemented |