Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0374 # 03 Y:2008 | 03 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,994 | $4,500 | Implemented |
WV0374 # 04 Y:2008 | 04 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $7,339 | $1,076 | Implemented |
WV0374 # 05 Y:2008 | 05 | 2008 | OPTIMIZE PLANT POWER FACTOR | $5,562 | $11,346 | Not Implemented |
WV0374 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,079 | $6,378 | Implemented |
WV0374 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $4,440 | $612 | Not Implemented |
WV0374 # 08 Y:2008 | 08 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,513 | $315 | Implemented |
WV0374 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,039 | $9,054 | Not Implemented |
WV0374 # 10 Y:2008 | 10 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,784 | $440 | Not Implemented |
WV0374 # 11 Y:2008 | 11 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,750 | $1,884 | Not Implemented |
WV0374 # 12 Y:2008 | 12 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $389 | $690 | Not Implemented |
MA0632 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,404 | $14,500 | Implemented |
MA0632 # 02 Y:2008 | 02 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,185 | $17,080 | Not Implemented |
MA0632 # 03 Y:2008 | 03 | 2008 | AIR CONDITION ONLY SPACE NECESSARY | $4,818 | $19,300 | Not Implemented |
MA0632 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,265 | $4,100 | Implemented |
MA0632 # 05 Y:2008 | 05 | 2008 | REDUCE VENTILATION AIR | $2,499 | $9,000 | Implemented |
MA0632 # 06 Y:2008 | 06 | 2008 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $2,149 | $11,000 | Not Implemented |
MA0632 # 07 Y:2008 | 07 | 2008 | INSULATE BARE EQUIPMENT | $383 | $650 | Implemented |
GT0847 # 01 Y:2008 | 01 | 2008 | USE BUILDING MATERIALS WHICH REQUIRE LESS ENERGY TO PRODUCE | $153,731 | $0 | Not Implemented |
GT0847 # 02 Y:2008 | 02 | 2008 | REUSE SCRAP GLASS AS FEED STOCK | $729,921 | $850,000 | Implemented |
GT0847 # 03 Y:2008 | 03 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $798,070 | $1,116,000 | Not Implemented |
GT0847 # 04 Y:2008 | 04 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $788,500 | $514,500 | Not Implemented |
GT0847 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,596 | $8,400 | Not Implemented |
GT0847 # 06 Y:2008 | 06 | 2008 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $22,551 | $68,143 | Not Implemented |
WV0373 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,505 | $23,741 | Not Implemented |
WV0373 # 02 Y:2008 | 02 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,342 | $29,120 | Not Implemented |