Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0382 # 05 Y:2010 | 05 | 2010 | USE PHOTOCELL CONTROLS | $4,141 | $6,637 | Implemented |
SF0382 # 06 Y:2010 | 06 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,265 | $8,098 | Not Implemented |
SF0382 # 07 Y:2010 | 07 | 2010 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $10,035 | $18,281 | Not Implemented |
SF0382 # 08 Y:2010 | 08 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,262 | $14,381 | Not Implemented |
SF0382 # 09 Y:2010 | 09 | 2010 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $165,218 | $158,868 | Not Implemented |
SF0382 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $12,608 | $36,493 | Implemented |
SF0382 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $733 | $2,953 | Implemented |
SF0382 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,423 | $62,855 | Implemented |
SF0383 # 01 Y:2010 | 01 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $229 | $40 | Not Implemented |
SF0383 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $245 | $618 | Not Implemented |
SF0383 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,563 | $42,318 | Not Implemented |
SF0383 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,697 | $28,699 | Not Implemented |
SF0383 # 05 Y:2010 | 05 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,340 | $20,638 | Not Implemented |
SF0383 # 06 Y:2010 | 06 | 2010 | INSULATE BARE EQUIPMENT | $222 | $1,278 | Not Implemented |
SF0383 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,819 | $14,000 | Not Implemented |
SF0383 # 08 Y:2010 | 08 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,999 | $26,118 | Not Implemented |
UD0813 # 01 Y:2010 | 01 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $41,029 | $28,680 | Not Implemented |
UD0813 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $561 | $540 | Not Implemented |
UD0813 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $944 | $0 | Implemented |
UD0813 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,803 | $0 | Implemented |
UD0813 # 05 Y:2010 | 05 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $1,354 | $360 | Not Implemented |
UD0813 # 06 Y:2010 | 06 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $237 | $360 | Not Implemented |
UD0813 # 07 Y:2010 | 07 | 2010 | COVER OPEN TANKS | $1,343 | $716 | Not Implemented |
UD0813 # 08 Y:2010 | 08 | 2010 | COVER OPEN TANKS | $1,089 | $936 | Not Implemented |
UD0813 # 09 Y:2010 | 09 | 2010 | COVER OPEN TANKS | $1,174 | $1,468 | Not Implemented |