IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0382 # 05 Y:2010 05 2010 USE PHOTOCELL CONTROLS $4,141 $6,637 Implemented
SF0382 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,265 $8,098 Not Implemented
SF0382 # 07 Y:2010 07 2010 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $10,035 $18,281 Not Implemented
SF0382 # 08 Y:2010 08 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,262 $14,381 Not Implemented
SF0382 # 09 Y:2010 09 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $165,218 $158,868 Not Implemented
SF0382 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $12,608 $36,493 Implemented
SF0382 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $733 $2,953 Implemented
SF0382 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,423 $62,855 Implemented
SF0383 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $229 $40 Not Implemented
SF0383 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $245 $618 Not Implemented
SF0383 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,563 $42,318 Not Implemented
SF0383 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,697 $28,699 Not Implemented
SF0383 # 05 Y:2010 05 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,340 $20,638 Not Implemented
SF0383 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $222 $1,278 Not Implemented
SF0383 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,819 $14,000 Not Implemented
SF0383 # 08 Y:2010 08 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,999 $26,118 Not Implemented
UD0813 # 01 Y:2010 01 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $41,029 $28,680 Not Implemented
UD0813 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $561 $540 Not Implemented
UD0813 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $944 $0 Implemented
UD0813 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,803 $0 Implemented
UD0813 # 05 Y:2010 05 2010 UPGRADE CONTROLS ON COMPRESSORS $1,354 $360 Not Implemented
UD0813 # 06 Y:2010 06 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $237 $360 Not Implemented
UD0813 # 07 Y:2010 07 2010 COVER OPEN TANKS $1,343 $716 Not Implemented
UD0813 # 08 Y:2010 08 2010 COVER OPEN TANKS $1,089 $936 Not Implemented
UD0813 # 09 Y:2010 09 2010 COVER OPEN TANKS $1,174 $1,468 Not Implemented