Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1058 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,990 | $11,117 | Not Implemented |
UD1058 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,636 | $952 | Implemented |
UD1058 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,653 | $1,115 | Not Implemented |
UD1058 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,307 | $29,827 | Implemented |
UD1058 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $949 | $290 | Not Implemented |
SD0637 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $283 | $250 | Implemented |
SD0637 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $665 | $2,159 | Not Implemented |
SD0637 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,393 | $700 | Implemented |
SD0637 # 04 Y:2023 | 04 | 2023 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,593 | $8,642 | Not Implemented |
SD0637 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,827 | $115,927 | Not Implemented |
SD0637 # 06 Y:2023 | 06 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $53,597 | $0 | Not Implemented |
SD0637 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $788 | $1,660 | Not Implemented |
SD0637 # 08 Y:2023 | 08 | 2023 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,662 | $0 | Implemented |
SD0637 # 09 Y:2023 | 09 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,900 | $2,000 | Not Implemented |
SD0637 # 10 Y:2023 | 10 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $25,625 | $49,475 | Not Implemented |
SJ0004 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,246 | $90,267 | Implemented |
SJ0004 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,544 | $238 | Implemented |
SJ0004 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $96 | $171 | Not Implemented |
SJ0004 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,799 | $3,878 | Implemented |
SJ0004 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $163 | $0 | Not Implemented |
SF0602 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $632 | $0 | Not Implemented |
SF0602 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,182 | $1,800 | Not Implemented |
SF0602 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,138 | $2,126 | Not Implemented |
SF0602 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,571 | $47,276 | Not Implemented |
SF0602 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $31,205 | $105,364 | Not Implemented |