IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0626 # 05 Y:1997 05 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $400 $620 Implemented
GT0626 # 06 Y:1997 06 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $7,580 Not Implemented
GT0626 # 07 Y:1997 07 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $26,666 $4,200 Implemented
GT0626 # 08 Y:1997 08 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,315 $438 Not Implemented
GT0620 # 01 Y:1997 01 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,454 $1,200 Not Implemented
GT0620 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,260 $1,870 Not Implemented
GT0620 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,270 $6,830 Implemented
GT0620 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $390 $900 Not Implemented
GT0620 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN WATER LINES AND VALVES $55 $50 Implemented
GT0620 # 06 Y:1997 06 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $9,546 $50,000 Not Implemented
GT0625 # 01 Y:1997 01 1997 METER WASTE WATER $20,840 $0 Not Implemented
GT0625 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,500 $137,700 Not Implemented
GT0625 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,080 $400 Implemented
GT0625 # 04 Y:1997 04 1997 FILTER AND REUSE HYDRAULIC OIL $19,800 $7,150 Implemented
GT0625 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $8,640 $20,000 Not Implemented
GT0625 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,957 $5,695 Implemented
GT0625 # 07 Y:1997 07 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $26,000 $1,780 Not Implemented
GT0625 # 08 Y:1997 08 1997 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $743,700 $0 Implemented
GT0624 # 01 Y:1997 01 1997 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,995 $4,380 Implemented
GT0624 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,420 $900 Implemented
GT0624 # 03 Y:1997 03 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,480 $150 Implemented
GT0624 # 04 Y:1997 04 1997 UPGRADE CONTROLS ON COMPRESSORS $2,470 $0 Not Implemented
GT0624 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $80 $250 Not Implemented
GT0624 # 06 Y:1997 06 1997 CONVERT TO ELECTROSTATIC POWDER COATING $6,540 $0 Not Implemented
GT0624 # 07 Y:1997 07 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,600 $1,320 Not Implemented