Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,529
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0626 # 05 Y:1997 | 05 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $400 | $620 | Implemented |
GT0626 # 06 Y:1997 | 06 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $7,580 | Not Implemented |
GT0626 # 07 Y:1997 | 07 | 1997 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $26,666 | $4,200 | Implemented |
GT0626 # 08 Y:1997 | 08 | 1997 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $1,315 | $438 | Not Implemented |
GT0620 # 01 Y:1997 | 01 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,454 | $1,200 | Not Implemented |
GT0620 # 02 Y:1997 | 02 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,260 | $1,870 | Not Implemented |
GT0620 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,270 | $6,830 | Implemented |
GT0620 # 04 Y:1997 | 04 | 1997 | USE OPTIMUM THICKNESS INSULATION | $390 | $900 | Not Implemented |
GT0620 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $55 | $50 | Implemented |
GT0620 # 06 Y:1997 | 06 | 1997 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $9,546 | $50,000 | Not Implemented |
GT0625 # 01 Y:1997 | 01 | 1997 | METER WASTE WATER | $20,840 | $0 | Not Implemented |
GT0625 # 02 Y:1997 | 02 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,500 | $137,700 | Not Implemented |
GT0625 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,080 | $400 | Implemented |
GT0625 # 04 Y:1997 | 04 | 1997 | FILTER AND REUSE HYDRAULIC OIL | $19,800 | $7,150 | Implemented |
GT0625 # 05 Y:1997 | 05 | 1997 | REDUCE VENTILATION AIR | $8,640 | $20,000 | Not Implemented |
GT0625 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,957 | $5,695 | Implemented |
GT0625 # 07 Y:1997 | 07 | 1997 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $26,000 | $1,780 | Not Implemented |
GT0625 # 08 Y:1997 | 08 | 1997 | MAINTAIN/ENLARGE A STOCK OF SPARE PARTS | $743,700 | $0 | Implemented |
GT0624 # 01 Y:1997 | 01 | 1997 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,995 | $4,380 | Implemented |
GT0624 # 02 Y:1997 | 02 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,420 | $900 | Implemented |
GT0624 # 03 Y:1997 | 03 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,480 | $150 | Implemented |
GT0624 # 04 Y:1997 | 04 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $2,470 | $0 | Not Implemented |
GT0624 # 05 Y:1997 | 05 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $80 | $250 | Not Implemented |
GT0624 # 06 Y:1997 | 06 | 1997 | CONVERT TO ELECTROSTATIC POWDER COATING | $6,540 | $0 | Not Implemented |
GT0624 # 07 Y:1997 | 07 | 1997 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,600 | $1,320 | Not Implemented |