IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0077 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $370 $753 Not Implemented
MA0077 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,888 $4,650 Not Implemented
MA0077 # 04 Y:1986 04 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,705 $7,200 Not Implemented
MA0077 # 05 Y:1986 05 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $17,850 $22,500 Not Implemented
MA0077 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $40 Not Implemented
MA0077 # 07 Y:1986 07 1986 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,650 $907 Not Implemented
MA0077 # 08 Y:1986 08 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,082 $0 Not Implemented
MA0075 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $482 $300 Not Implemented
MA0075 # 02 Y:1986 02 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $0 Not Implemented
MA0075 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $565 $1,136 Implemented
MA0075 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,271 $119 Implemented
MA0075 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $1,753 $300 Not Implemented
MA0075 # 06 Y:1986 06 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $789 $800 Implemented
MA0075 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,134 $1,075 Implemented
MA0075 # 08 Y:1986 08 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,014 $7,500 Implemented
MA0073 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,084 $500 Not Implemented
MA0073 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $210 Not Implemented
MA0073 # 03 Y:1986 03 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,124 $12,000 Not Implemented
MA0074 # 01 Y:1986 01 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,075 $1,200 Implemented
MA0074 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $158 $100 Implemented
MA0074 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $365 $60 Implemented
MA0074 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122 $300 Implemented
MA0074 # 05 Y:1986 05 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $351 $540 Not Implemented
MA0070 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,611 $0 Not Implemented
MA0070 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $223 $200 Implemented