Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0077 # 02 Y:1986 | 02 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $370 | $753 | Not Implemented |
MA0077 # 03 Y:1986 | 03 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,888 | $4,650 | Not Implemented |
MA0077 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,705 | $7,200 | Not Implemented |
MA0077 # 05 Y:1986 | 05 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $17,850 | $22,500 | Not Implemented |
MA0077 # 06 Y:1986 | 06 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $580 | $40 | Not Implemented |
MA0077 # 07 Y:1986 | 07 | 1986 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,650 | $907 | Not Implemented |
MA0077 # 08 Y:1986 | 08 | 1986 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,082 | $0 | Not Implemented |
MA0075 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $482 | $300 | Not Implemented |
MA0075 # 02 Y:1986 | 02 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,147 | $0 | Not Implemented |
MA0075 # 03 Y:1986 | 03 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $565 | $1,136 | Implemented |
MA0075 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,271 | $119 | Implemented |
MA0075 # 05 Y:1986 | 05 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,753 | $300 | Not Implemented |
MA0075 # 06 Y:1986 | 06 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $789 | $800 | Implemented |
MA0075 # 07 Y:1986 | 07 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,134 | $1,075 | Implemented |
MA0075 # 08 Y:1986 | 08 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,014 | $7,500 | Implemented |
MA0073 # 01 Y:1986 | 01 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,084 | $500 | Not Implemented |
MA0073 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $210 | Not Implemented |
MA0073 # 03 Y:1986 | 03 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,124 | $12,000 | Not Implemented |
MA0074 # 01 Y:1986 | 01 | 1986 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,075 | $1,200 | Implemented |
MA0074 # 02 Y:1986 | 02 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $158 | $100 | Implemented |
MA0074 # 03 Y:1986 | 03 | 1986 | IMPROVE LUBRICATION PRACTICES | $365 | $60 | Implemented |
MA0074 # 04 Y:1986 | 04 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $122 | $300 | Implemented |
MA0074 # 05 Y:1986 | 05 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $351 | $540 | Not Implemented |
MA0070 # 01 Y:1986 | 01 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,611 | $0 | Not Implemented |
MA0070 # 02 Y:1986 | 02 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $223 | $200 | Implemented |