IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0560 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,641 $12,354 Not Implemented
OK0560 # 03 Y:1998 03 1998 IMPROVE SPACE COMFORT CONDITIONING $84,000 $330,000 Implemented
OK0560 # 04 Y:1998 04 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $6,750 $59,000 Not Implemented
OK0560 # 05 Y:1998 05 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,508 $27,000 Not Implemented
OK0560 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,039 $7,452 Implemented
OK0560 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,882 $0 Not Implemented
OK0560 # 08 Y:1998 08 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,735 $0 Implemented
OK0559 # 01 Y:1998 01 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $32,230 $140,000 Not Implemented
OK0559 # 02 Y:1998 02 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,376 $7,900 Not Implemented
OK0559 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $673 $0 Not Implemented
OK0559 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $660 Implemented
OK0558 # 01 Y:1998 01 1998 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $43,625 $44,730 Not Implemented
OK0558 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,594 $0 Implemented
OK0558 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $4,561 $3,300 Not Implemented
OK0558 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $149,760 $280,000 Implemented
OK0558 # 05 Y:1998 05 1998 COVER INK CONTAINERS WHEN NOT IN USE $49,090 $5,700 Implemented
OK0557 # 01 Y:1998 01 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $956 $2,140 Implemented
OK0557 # 02 Y:1998 02 1998 USE POWER DURING OFF-PEAK PERIODS $15,633 $0 Implemented
OK0557 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $715 $250 Implemented
OK0557 # 04 Y:1998 04 1998 PAY UTILITY BILLS ON TIME $656 $0 Implemented
OK0557 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,969 $50,000 Implemented
OK0557 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $41,600 $260,000 Not Implemented
OK0556 # 01 Y:1998 01 1998 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $75,726 $9,000 Implemented
OK0556 # 02 Y:1998 02 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $227 $678 Implemented
OK0556 # 03 Y:1998 03 1998 REPAIR AND ELIMINATE STEAM LEAKS $1,303 $500 Implemented