Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0641 # 04 Y:1998 | 04 | 1998 | REVISE RAW MATERIAL SPECS | $14,100 | $0 | Implemented |
GT0641 # 05 Y:1998 | 05 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $2,640 | $0 | Implemented |
GT0641 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,932 | $2,700 | Implemented |
GT0641 # 07 Y:1998 | 07 | 1998 | USE LESS WASTEFUL PACKAGING | $143 | $0 | Not Implemented |
HO0183 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,829 | $7,483 | Not Implemented |
HO0183 # 02 Y:1998 | 02 | 1998 | ADD AREA LIGHTING SWITCHES | $621 | $500 | Implemented |
HO0183 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $297 | $552 | Not Implemented |
HO0183 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $225 | $250 | Implemented |
HO0183 # 05 Y:1998 | 05 | 1998 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $6,570 | $27,500 | Not Implemented |
HO0183 # 06 Y:1998 | 06 | 1998 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,620 | $3,000 | Implemented |
HO0183 # 07 Y:1998 | 07 | 1998 | INSTALL BACK-UP EQUIPMENT | $3,040 | $8,000 | Not Implemented |
HO0183 # 08 Y:1998 | 08 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $11,680 | $0 | Not Implemented |
HO0183 # 09 Y:1998 | 09 | 1998 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $5,840 | $800 | Not Implemented |
AR0140 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $33,786 | $22,860 | n/a |
AR0140 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,967 | $250 | n/a |
AR0140 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,420 | $130 | n/a |
AR0140 # 04 Y:1998 | 04 | 1998 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,592 | $3,260 | n/a |
AR0140 # 05 Y:1998 | 05 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $499 | $279 | n/a |
AR0140 # 06 Y:1998 | 06 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $13,190 | $8,000 | n/a |
AR0140 # 07 Y:1998 | 07 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $46,527 | $1,000 | n/a |
AR0140 # 08 Y:1998 | 08 | 1998 | REDUCE SCRAP PRODUCTION | $14,997 | $18,800 | n/a |
AR0140 # 09 Y:1998 | 09 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $66,072 | $3,200 | n/a |
AR0140 # 10 Y:1998 | 10 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $66,000 | $1,280 | n/a |
BD0115 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,739 | $20,000 | Not Implemented |
BD0115 # 02 Y:1998 | 02 | 1998 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $7,819 | $12,000 | Implemented |