IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0641 # 04 Y:1998 04 1998 REVISE RAW MATERIAL SPECS $14,100 $0 Implemented
GT0641 # 05 Y:1998 05 1998 RECOVER AND REUSE WASTE MATERIAL $2,640 $0 Implemented
GT0641 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,932 $2,700 Implemented
GT0641 # 07 Y:1998 07 1998 USE LESS WASTEFUL PACKAGING $143 $0 Not Implemented
HO0183 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,829 $7,483 Not Implemented
HO0183 # 02 Y:1998 02 1998 ADD AREA LIGHTING SWITCHES $621 $500 Implemented
HO0183 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $297 $552 Not Implemented
HO0183 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $225 $250 Implemented
HO0183 # 05 Y:1998 05 1998 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $6,570 $27,500 Not Implemented
HO0183 # 06 Y:1998 06 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,620 $3,000 Implemented
HO0183 # 07 Y:1998 07 1998 INSTALL BACK-UP EQUIPMENT $3,040 $8,000 Not Implemented
HO0183 # 08 Y:1998 08 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $11,680 $0 Not Implemented
HO0183 # 09 Y:1998 09 1998 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $5,840 $800 Not Implemented
AR0140 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $33,786 $22,860 n/a
AR0140 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,967 $250 n/a
AR0140 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,420 $130 n/a
AR0140 # 04 Y:1998 04 1998 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,592 $3,260 n/a
AR0140 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $499 $279 n/a
AR0140 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,190 $8,000 n/a
AR0140 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $46,527 $1,000 n/a
AR0140 # 08 Y:1998 08 1998 REDUCE SCRAP PRODUCTION $14,997 $18,800 n/a
AR0140 # 09 Y:1998 09 1998 MOVE PRODUCT USING MECHANICAL MEANS $66,072 $3,200 n/a
AR0140 # 10 Y:1998 10 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $66,000 $1,280 n/a
BD0115 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $13,739 $20,000 Not Implemented
BD0115 # 02 Y:1998 02 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,819 $12,000 Implemented