IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0084 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,612 $4,021 Not Implemented
IC0084 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $943 $582,998 Implemented
IC0084 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,024 $430,000 Not Implemented
IC0084 # 08 Y:2004 08 2004 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $48,922 $200 Implemented
IC0084 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $124,469 $513 Implemented
IC0084 # 10 Y:2004 10 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $794 $5,100 Implemented
IC0084 # 11 Y:2004 11 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $122 $0 Implemented
IC0084 # 12 Y:2004 12 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $156 $1,854 Not Implemented
IC0084 # 13 Y:2004 13 2004 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $197 $240 Implemented
IC0084 # 14 Y:2004 14 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,645 $96,551 Not Implemented
IC0084 # 15 Y:2004 15 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,601 $13,349 Not Implemented
IC0084 # 16 Y:2004 16 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,775 $2,376 Not Implemented
IC0084 # 17 Y:2004 17 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,694 $5,190 Not Implemented
IC0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $522 $400 Implemented
IC0079 # 02 Y:2004 02 2004 USE OPTIMUM TEMPERATURE $4,226 $0 Not Implemented
IC0079 # 03 Y:2004 03 2004 INSTALL AUTOMATIC STACK DAMPER $943 $375 Not Implemented
IC0079 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $311 $224 Implemented
IC0079 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,244 $18,858 Implemented
IC0079 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $2,248 $9,540 Implemented
IC0079 # 07 Y:2004 07 2004 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,706 $0 Not Implemented
IC0079 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,734 $0 Implemented
IC0079 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,159,243 $6,681,290 Implemented
WV0297 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $121,920 $33,990 Not Implemented
WV0297 # 02 Y:2004 02 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $25,862 $55,500 Not Implemented
WV0297 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,874 $6,254 Not Implemented