IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0486 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $2,878 $4,661 Not Implemented
NC0486 # 04 Y:2013 04 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,752 $4,400 Not Implemented
SF0432 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,539 $0 Not Implemented
SF0432 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,729 $0 Not Implemented
SF0432 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,942 $176,082 Not Implemented
SF0432 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $70,722 $226,685 Implemented
SF0432 # 05 Y:2013 05 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,321 $22,006 Implemented
SF0432 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,285 $208,561 Implemented
SF0432 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $10,784 $5,853 Implemented
BS0016 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $15,856 $27,630 Implemented
BS0016 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $571 $184 Implemented
BS0016 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $437 $604 Implemented
BS0016 # 04 Y:2013 04 2013 COVER OPEN TANKS $4,197 $1,600 Implemented
BS0016 # 05 Y:2013 05 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,127 $6,826 Not Implemented
BS0016 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,648 $1,185 Not Implemented
SD0470 # 01 Y:2013 01 2013 REDUCE SCRAP PRODUCTION $34,364 $57,749 Implemented
SD0470 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $10,475 $32,420 Not Implemented
SD0470 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,854 $2,300 Implemented
SD0470 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $4,614 $4,625 Implemented
SD0470 # 05 Y:2013 05 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,160 $14,000 Not Implemented
SD0470 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,569 $600 Not Implemented
SD0470 # 07 Y:2013 07 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,245 $9,125 Not Implemented
SD0470 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,241 $2,390 Not Implemented
WV0468 # 01 Y:2013 01 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $20,196 $57,000 Not Implemented
WV0468 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,596 $31,932 Implemented