IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0668 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $20,693 $21,375 Not Implemented
OR0668 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,529 $42,750 Not Implemented
OR0668 # 06 Y:2016 06 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $20,233 $54,456 Not Implemented
OR0668 # 07 Y:2016 07 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $131,042 $638,642 Not Implemented
OR0668 # 08 Y:2016 08 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,925 $70,000 Not Implemented
SF0479 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $796 $70 Not Implemented
SF0479 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $210 Implemented
SF0479 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,397 $4,166 Implemented
SF0479 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $846 $2,490 Implemented
SF0479 # 05 Y:2016 05 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $24,263 $204,396 Not Implemented
MA0756 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,102 $6,500 Implemented
MA0756 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $6,277 $2,320 Not Implemented
MA0756 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,797 $7,000 Implemented
MA0756 # 04 Y:2016 04 2016 REDUCE VENTILATION AIR $1,278 $1,000 Not Implemented
MA0756 # 05 Y:2016 05 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,508 $10,800 Not Implemented
MA0756 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $576 $1,392 Not Implemented
TT0167 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,026 $4,452 Not Implemented
TT0167 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $27,708 $28,000 Implemented
TT0167 # 03 Y:2016 03 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,627 $5,200 Not Implemented
TT0167 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,188 $170,642 Implemented
TT0167 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,407 $125 Implemented
TT0167 # 06 Y:2016 06 2016 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,213 $900 Not Implemented
TT0167 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,887 $3,000 Implemented
TT0167 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,764 $500 Implemented
TT0167 # 09 Y:2016 09 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,481 $500 Not Implemented