Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,102
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0918 # 05 Y:2024 | 05 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,601 | $3,000 | n/a |
AS0571 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,526 | $55,952 | n/a |
AS0571 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $61,102 | $20,000 | n/a |
AS0571 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $22,882 | $38 | n/a |
AS0571 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,525 | $34,427 | n/a |
AS0571 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,292 | $908 | n/a |
AS0571 # 06 Y:2024 | 06 | 2024 | USE POWER DURING OFF-PEAK PERIODS | $492 | $511 | n/a |
AS0571 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $430 | $987 | n/a |
UD1082 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,232 | $1,235 | n/a |
UD1082 # 02 Y:2024 | 02 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,315 | $760 | n/a |
UD1082 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,327 | $9,308 | n/a |
UD1082 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35,677 | $0 | n/a |
UD1082 # 05 Y:2024 | 05 | 2024 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $20,600 | $93,250 | n/a |
UD1082 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,369 | $0 | n/a |
UD1082 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,431 | $2,001 | n/a |
UD1082 # 08 Y:2024 | 08 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,575 | $11,626 | n/a |
UD1082 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,739 | $18,600 | n/a |
UD1082 # 10 Y:2024 | 10 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $245 | $0 | n/a |
SJ0017 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $184,626 | $998,282 | n/a |
SJ0017 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,795 | $0 | n/a |
SJ0017 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,258 | $759 | n/a |
SJ0017 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,517 | $17 | n/a |
SJ0017 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,226 | $414 | n/a |
SJ0017 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,102 | $51,343 | n/a |
SJ0017 # 07 Y:2024 | 07 | 2024 | COMBINE UTILITY METERS | $6,947 | $0 | n/a |