Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,529
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0624 # 08 Y:1997 | 08 | 1997 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $18,900 | $4,000 | Not Implemented |
GT0623 # 01 Y:1997 | 01 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $300 | $390 | Not Implemented |
GT0623 # 02 Y:1997 | 02 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $111 | $120 | Not Implemented |
GT0623 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $85 | $300 | Not Implemented |
GT0623 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $290 | $100 | Implemented |
GT0623 # 05 Y:1997 | 05 | 1997 | REDUCE VENTILATION AIR | $220 | $1,200 | Implemented |
GT0623 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $429 | $1,300 | Not Implemented |
GT0623 # 07 Y:1997 | 07 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $765 | $0 | Not Implemented |
GT0623 # 08 Y:1997 | 08 | 1997 | MOVE PRODUCT USING MECHANICAL MEANS | $4,130 | $2,500 | Implemented |
GT0621 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,160 | $200 | Implemented |
GT0621 # 02 Y:1997 | 02 | 1997 | INSTALL BACK-UP EQUIPMENT | $124,259 | $82,550 | Not Implemented |
GT0621 # 03 Y:1997 | 03 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,020 | $1,590 | Implemented |
GT0621 # 04 Y:1997 | 04 | 1997 | COVER OPEN TANKS | $4,950 | $5,000 | Not Implemented |
GT0621 # 05 Y:1997 | 05 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $38,180 | $0 | Implemented |
GT0621 # 06 Y:1997 | 06 | 1997 | METER WASTE WATER | $170 | $0 | Not Implemented |
GT0621 # 07 Y:1997 | 07 | 1997 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $6,600 | $6,600 | Not Implemented |
GT0622 # 01 Y:1997 | 01 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $980 | $2,000 | Implemented |
GT0622 # 02 Y:1997 | 02 | 1997 | REPAIR AND ELIMINATE STEAM LEAKS | $3,470 | $1,200 | Implemented |
GT0622 # 03 Y:1997 | 03 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $94 | $240 | Not Implemented |
GT0622 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,626 | $300 | Implemented |
GT0622 # 05 Y:1997 | 05 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,060 | $632 | Implemented |
GT0622 # 06 Y:1997 | 06 | 1997 | MINIMIZE WATER USAGE | $533 | $0 | Not Implemented |
GT0622 # 07 Y:1997 | 07 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $4,999 | $3,200 | Not Implemented |
GT0622 # 08 Y:1997 | 08 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $207,108 | $330,000 | Not Implemented |
GT0622 # 09 Y:1997 | 09 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,890 | $0 | Not Implemented |