IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0624 # 08 Y:1997 08 1997 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $18,900 $4,000 Not Implemented
GT0623 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $300 $390 Not Implemented
GT0623 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $111 $120 Not Implemented
GT0623 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $85 $300 Not Implemented
GT0623 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $100 Implemented
GT0623 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $220 $1,200 Implemented
GT0623 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $429 $1,300 Not Implemented
GT0623 # 07 Y:1997 07 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $765 $0 Not Implemented
GT0623 # 08 Y:1997 08 1997 MOVE PRODUCT USING MECHANICAL MEANS $4,130 $2,500 Implemented
GT0621 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $200 Implemented
GT0621 # 02 Y:1997 02 1997 INSTALL BACK-UP EQUIPMENT $124,259 $82,550 Not Implemented
GT0621 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $1,590 Implemented
GT0621 # 04 Y:1997 04 1997 COVER OPEN TANKS $4,950 $5,000 Not Implemented
GT0621 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,180 $0 Implemented
GT0621 # 06 Y:1997 06 1997 METER WASTE WATER $170 $0 Not Implemented
GT0621 # 07 Y:1997 07 1997 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $6,600 $6,600 Not Implemented
GT0622 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $980 $2,000 Implemented
GT0622 # 02 Y:1997 02 1997 REPAIR AND ELIMINATE STEAM LEAKS $3,470 $1,200 Implemented
GT0622 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $240 Not Implemented
GT0622 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,626 $300 Implemented
GT0622 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,060 $632 Implemented
GT0622 # 06 Y:1997 06 1997 MINIMIZE WATER USAGE $533 $0 Not Implemented
GT0622 # 07 Y:1997 07 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,999 $3,200 Not Implemented
GT0622 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $207,108 $330,000 Not Implemented
GT0622 # 09 Y:1997 09 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,890 $0 Not Implemented