IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0235 # 13 Y:2006 13 2006 KEEP BOILER TUBES CLEAN $1,255 $720 Implemented
SU0235 # 14 Y:2006 14 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,613 $9,400 Not Implemented
SU0234 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,432 $0 Implemented
SU0234 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $886 $0 Not Implemented
SU0234 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $118 $0 Not Implemented
SU0234 # 04 Y:2006 04 2006 REDUCE VENTILATION AIR $54,755 $2,502 Implemented
SU0234 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,897 $3,680 Implemented
SU0234 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,746 $1,114 Not Implemented
SU0234 # 07 Y:2006 07 2006 REPAIR OR REPLACE STEAM TRAPS $2,258 $623 Implemented
SU0234 # 08 Y:2006 08 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,470 $8,599 Implemented
SU0234 # 09 Y:2006 09 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,901 $0 Not Implemented
SU0234 # 10 Y:2006 10 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $7,801 $6,762 Implemented
SU0234 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,955 $48,745 Implemented
SU0234 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $966 $1,217 Not Implemented
SU0234 # 13 Y:2006 13 2006 INSULATE BARE EQUIPMENT $792 $1,409 Implemented
SU0234 # 14 Y:2006 14 2006 INSULATE BARE EQUIPMENT $579 $1,245 Not Implemented
SU0234 # 15 Y:2006 15 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $271 $708 Not Implemented
SU0234 # 16 Y:2006 16 2006 INSTALL OCCUPANCY SENSORS $500 $1,351 Implemented
SU0233 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,928 $542 Not Implemented
SU0233 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,182 $1,050 Implemented
SU0233 # 07 Y:2006 07 2006 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $14,472 $9,451 Not Implemented
SU0233 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,003 $7,100 Not Implemented
SU0233 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,954 $81,620 Not Implemented
SU0233 # 10 Y:2006 10 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $392 $687 Not Implemented
SU0233 # 11 Y:2006 11 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,021 $11,554 Not Implemented