Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0624 # 05 Y:2012 | 05 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $935 | $400 | Implemented |
AM0624 # 06 Y:2012 | 06 | 2012 | USE SYNTHETIC LUBRICANT | $2,490 | $0 | Not Implemented |
AM0624 # 07 Y:2012 | 07 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,600 | $480 | Implemented |
AM0624 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $415 | $350 | Implemented |
AM0624 # 02 Y:2012 | 02 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $360 | $0 | Implemented |
AM0624 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,100 | $0 | Implemented |
AM0623 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $75,600 | $270,000 | Not Implemented |
AM0623 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,800 | $13,240 | Not Implemented |
AM0623 # 03 Y:2012 | 03 | 2012 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $36,640 | $10,000 | Not Implemented |
AM0623 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,838 | $500 | Not Implemented |
AM0623 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,538 | $1,045 | Not Implemented |
AM0623 # 06 Y:2012 | 06 | 2012 | OPTIMIZE PLANT POWER FACTOR | $4,500 | $8,160 | Not Implemented |
AM0623 # 07 Y:2012 | 07 | 2012 | TREAT AND REUSE RINSE WATERS | $3,300 | $3,000 | Not Implemented |
AM0623 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $3,100 | $570 | Not Implemented |
AM0623 # 09 Y:2012 | 09 | 2012 | USE SYNTHETIC LUBRICANT | $1,010 | $0 | Not Implemented |
OK0835 # 01 Y:2012 | 01 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,445 | $1,500 | Implemented |
OK0835 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,644 | $17,103 | Not Implemented |
OK0835 # 03 Y:2012 | 03 | 2012 | REPLACE BOILER | $10,532 | $96,000 | Not Implemented |
OK0835 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $538 | $3,183 | Implemented |
OK0835 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $815 | $5,126 | Not Implemented |
OK0835 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,902 | $19,520 | Not Implemented |
OK0835 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,139 | $33,990 | Not Implemented |
OK0835 # 08 Y:2012 | 08 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,097 | $24,155 | Not Implemented |
OK0835 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,068 | $1,288 | Not Implemented |
OK0835 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,937 | $1,000 | Implemented |