Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0624 # 05 Y:2012 05 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $935 $400 Implemented
AM0624 # 06 Y:2012 06 2012 USE SYNTHETIC LUBRICANT $2,490 $0 Not Implemented
AM0624 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,600 $480 Implemented
AM0624 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $415 $350 Implemented
AM0624 # 02 Y:2012 02 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $360 $0 Implemented
AM0624 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $12,100 $0 Implemented
AM0623 # 01 Y:2012 01 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75,600 $270,000 Not Implemented
AM0623 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,800 $13,240 Not Implemented
AM0623 # 03 Y:2012 03 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $36,640 $10,000 Not Implemented
AM0623 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,838 $500 Not Implemented
AM0623 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,538 $1,045 Not Implemented
AM0623 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $4,500 $8,160 Not Implemented
AM0623 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $3,300 $3,000 Not Implemented
AM0623 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $3,100 $570 Not Implemented
AM0623 # 09 Y:2012 09 2012 USE SYNTHETIC LUBRICANT $1,010 $0 Not Implemented
OK0835 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,445 $1,500 Implemented
OK0835 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,644 $17,103 Not Implemented
OK0835 # 03 Y:2012 03 2012 REPLACE BOILER $10,532 $96,000 Not Implemented
OK0835 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $538 $3,183 Implemented
OK0835 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $5,126 Not Implemented
OK0835 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $18,902 $19,520 Not Implemented
OK0835 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,139 $33,990 Not Implemented
OK0835 # 08 Y:2012 08 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,097 $24,155 Not Implemented
OK0835 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,068 $1,288 Not Implemented
OK0835 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,937 $1,000 Implemented