IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0008 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,300 $0 Implemented
TA0008 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,370 $1,456 Not Implemented
TA0008 # 03 Y:2001 03 2001 PAY UTILITY BILLS ON TIME $898 $0 Implemented
TA0008 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $664 $0 Implemented
TA0008 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $368 $634 Implemented
TA0008 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $260 $332 Not Implemented
SU0112 # 01 Y:2001 01 2001 EXPAND OPERATIONS INTO UNUSED SPACE $3,042 $30 Not Implemented
SU0112 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $319 $0 Implemented
SU0112 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,827 $2,088 Implemented
SU0112 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,183 $90 Not Implemented
SU0112 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $421 $0 Not Implemented
SU0112 # 06 Y:2001 06 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,560 $120,000 Implemented
SU0112 # 07 Y:2001 07 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $223 $0 Not Implemented
SD0282 # 01 Y:2001 01 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,980,189 $2,980,189 Not Implemented
SD0282 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $5,953 $190 Implemented
SD0282 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103,026 $8,000 Implemented
SD0282 # 04 Y:2001 04 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,804 $3,550 Implemented
SD0282 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,312 $2,000 Not Implemented
SD0282 # 06 Y:2001 06 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $33,122 $55,000 Not Implemented
SD0282 # 07 Y:2001 07 2001 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $55,555 $10,000 Implemented
SD0282 # 08 Y:2001 08 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $83,687 $110,000 Not Implemented
SD0282 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,108 $8,000 Not Implemented
SD0282 # 10 Y:2001 10 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $348,473 $150,000 Not Implemented
SD0282 # 11 Y:2001 11 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,832,890 $1,400,000 Not Implemented
SD0282 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,600 $500 Not Implemented