Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0468 # 03 Y:2013 | 03 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,882 | $2,000 | Not Implemented |
WV0468 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,463 | $29,680 | Implemented |
WV0468 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,865 | $3,830 | Implemented |
WV0468 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,088 | $5,770 | Implemented |
WV0468 # 07 Y:2013 | 07 | 2013 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,362 | $11,000 | Implemented |
WV0468 # 08 Y:2013 | 08 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,416 | $5,160 | Not Implemented |
WV0468 # 09 Y:2013 | 09 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,020 | $1,000 | Not Implemented |
WV0468 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $731 | $225 | Implemented |
WV0468 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $496 | $30 | Implemented |
WV0468 # 12 Y:2013 | 12 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $452 | $1,125 | Implemented |
WV0467 # 01 Y:2013 | 01 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $26,386 | $31,000 | Not Implemented |
WV0467 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,885 | $0 | Not Implemented |
WV0467 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,786 | $2,550 | Implemented |
WV0467 # 04 Y:2013 | 04 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,526 | $21,000 | Not Implemented |
WV0467 # 05 Y:2013 | 05 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $9,901 | $1,000 | Implemented |
WV0467 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,844 | $500 | Implemented |
WV0467 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,668 | $16,750 | Not Implemented |
WV0467 # 08 Y:2013 | 08 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $5,230 | $3,625 | Not Implemented |
WV0467 # 09 Y:2013 | 09 | 2013 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,986 | $9,400 | Not Implemented |
WV0467 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,815 | $248 | Implemented |
WV0467 # 11 Y:2013 | 11 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,059 | $571 | Implemented |
WV0467 # 12 Y:2013 | 12 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,260 | $45 | Implemented |
WV0467 # 13 Y:2013 | 13 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $534 | $826 | Not Implemented |
WV0467 # 14 Y:2013 | 14 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $326 | $810 | Not Implemented |
BD0425 # 01 Y:2013 | 01 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $22,668 | $34,200 | Not Implemented |