IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0524 # 05 Y:2019 05 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $19,167 $89,865 Not Implemented
UF0524 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,978 $400 Implemented
UF0524 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,897 $0 Implemented
UF0524 # 08 Y:2019 08 2019 ISOLATE HOT OR COLD EQUIPMENT $4,945 $5,090 Not Implemented
UF0524 # 09 Y:2019 09 2019 TREAT AND REUSE RINSE WATERS $17,615 $0 Implemented
OK1005 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $127,275 $96,138 Not Implemented
OK1005 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,747 $27,232 Not Implemented
OK1005 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,742 $13,761 Not Implemented
OK1005 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,674 $34,500 Not Implemented
OK1005 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,363 $100,260 Not Implemented
OK1005 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $20,771 $24,531 Not Implemented
OK1005 # 07 Y:2019 07 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,218 $5,291 Not Implemented
OK1005 # 08 Y:2019 08 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,015 $548 Not Implemented
OK1005 # 09 Y:2019 09 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $913 $0 Not Implemented
OK1005 # 10 Y:2019 10 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,469 $300 Not Implemented
BS0120 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,949 $2,100 Not Implemented
BS0120 # 02 Y:2019 02 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,165 $4,875 Not Implemented
BS0120 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,195 $210 Not Implemented
BS0120 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $463 $1,200 Not Implemented
BS0120 # 05 Y:2019 05 2019 INSTALL TIMERS AND/OR THERMOSTATS $1,832 $411 Not Implemented
MI0347 # 01 Y:2019 01 2019 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $8,536 $4,314 Not Implemented
MI0347 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,058 $30,007 Not Implemented
MI0347 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,740 $2,923 Implemented
MI0347 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $5,404 $3,100 Implemented
MI0347 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,870 $12,067 Implemented