Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0716 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,967 | $10,000 | Implemented |
OR0716 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,289 | $1,500 | Implemented |
OR0716 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,971 | $1,200 | Implemented |
OR0716 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $9,287 | $19,796 | Not Implemented |
OR0716 # 07 Y:2019 | 07 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,641 | $23,504 | Not Implemented |
MI0347 # 01 Y:2019 | 01 | 2019 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $8,536 | $4,314 | Not Implemented |
MI0347 # 02 Y:2019 | 02 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,058 | $30,007 | Not Implemented |
MI0347 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,740 | $2,923 | Implemented |
MI0347 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,404 | $3,100 | Implemented |
MI0347 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,870 | $12,067 | Implemented |
MI0347 # 06 Y:2019 | 06 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,152 | $10,680 | Not Implemented |
MI0347 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,680 | $2,020 | Not Implemented |
MI0347 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,489 | $5,529 | Implemented |
MI0347 # 09 Y:2019 | 09 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,469 | $1,640 | Not Implemented |
MI0347 # 10 Y:2019 | 10 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,492 | $7,000 | Not Implemented |
MI0347 # 11 Y:2019 | 11 | 2019 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,617 | $1,707 | Implemented |
MI0347 # 12 Y:2019 | 12 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $547 | $480 | Implemented |
BS0120 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,949 | $2,100 | Not Implemented |
BS0120 # 02 Y:2019 | 02 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,165 | $4,875 | Not Implemented |
NC0628 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,628 | $15,967 | Not Implemented |
NC0628 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $45 | $100 | Not Implemented |
NC0628 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $580 | $200 | Implemented |
NC0628 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,500 | $70,000 | Not Implemented |
NC0628 # 05 Y:2019 | 05 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $29,932 | $120,000 | Not Implemented |
NC0628 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $785 | $1,500 | Not Implemented |