IAC logo
IAC Assessment: NC0628
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0628
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Engineered wood products
NAICS 321213 - Engineered Wood Member (except Truss) Manufacturing
SIC 2439 - Structural Wood Members, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 330,000
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $337,055 7,416,530 kWh $0.05
Electricity Demand $192,239 16,534 kW-months/year $11.63
Natural Gas $124,952 23,448 MMBtu $5.33
TOTAL ENERGY COSTS $654,246
RECOMMENDED SAVINGS* $62,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $580
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,628
Cost:
$15,967
$2,509 55,274 $2,119 182 - - $2,509
55,274
kWh
$2,119
182
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$45
Cost:
$100
$45 998 - - - - $45
998
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$580
Cost:
$200
$427 9,415 $153 13 - - $427
9,415
kWh
$153
13
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,500
Cost:
$70,000
$19,522 430,000 $6,978 600 - - $19,522
430,000
kWh
$6,978
600
kW-months/year
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$29,932
Cost:
$120,000
$16,925 372,800 $13,007 1,118 - - $16,925
372,800
kWh
$13,007
1,118
kW-months/year
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$785
Cost:
$1,500
- - - - $785 - -
-
kWh
-
-
kW-months/year
$785
-
$
TOTAL RECOMMENDED Savings:
$62,470
Cost:
$207,767
$39,428 868,487 $22,257 1,913 $785 - $39,428
868,487
kWh
$22,257
1,913
kW-months/year
$785
-
$
TOTAL IMPLEMENTED Savings:
$580
Cost:
$200
$427 9,415 $153 13 - - $427
9,415
kWh
$153
13
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees