IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0445 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,543 $9,823 Not Implemented
UF0445 # 03 Y:2011 03 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,693 $939 Not Implemented
UF0445 # 04 Y:2011 04 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $25,323 $75,000 Implemented
UF0445 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $43,678 $2,580 Not Implemented
UF0445 # 06 Y:2011 06 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,582 $2,580 Implemented
UF0445 # 07 Y:2011 07 2011 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $802 $1,378 Not Implemented
UF0445 # 08 Y:2011 08 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $735 $1,280 Not Implemented
UF0445 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,370 $8,778 Implemented
UF0445 # 10 Y:2011 10 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $118,931 $150,000 Not Implemented
MI0210 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,568 $175,700 Not Implemented
MI0210 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,559 $7,338 Not Implemented
MI0210 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,805 $1,320 Implemented
MI0210 # 04 Y:2011 04 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,342 $1,350 Not Implemented
MI0210 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,730 $26,000 Implemented
MI0210 # 06 Y:2011 06 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,125 $133,000 Implemented
MI0210 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,851 $20,000 Not Implemented
MI0210 # 08 Y:2011 08 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $16,463 $16,554 Not Implemented
MI0210 # 09 Y:2011 09 2011 HEAT WATER WITH EXHAUST HEAT $16,131 $30,000 Not Implemented
MI0210 # 10 Y:2011 10 2011 USE RADIANT HEATER FOR SPOT HEATING $8,346 $10,000 Implemented
MI0210 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,145 $8,889 Implemented
MI0210 # 12 Y:2011 12 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $5,455 $2,425 Implemented
UF0444 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,948 $19,732 Implemented
UF0444 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $19,284 $813 Implemented
UF0444 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,401 $404 Implemented
UF0444 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,428 $25,300 Not Implemented