IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0231 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $1,337 $0 Implemented
SU0231 # 04 Y:2006 04 2006 KEEP BOILER TUBES CLEAN $8,242 $1,800 Implemented
SU0231 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,758 $823 Implemented
SU0231 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,335 $19,002 Not Implemented
SU0231 # 07 Y:2006 07 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $256 $755 Implemented
SU0231 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $89 $266 Implemented
SU0231 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,405 $12,425 Not Implemented
UU0101 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,190 $10,000 Not Implemented
UU0101 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,280 $4,150 Not Implemented
UU0101 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,230 $3,050 Not Implemented
UU0101 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,760 $10,030 Not Implemented
UU0101 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $3,770 $4,140 Not Implemented
UU0101 # 06 Y:2006 06 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $100,330 $52,800 Not Implemented
UU0100 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,720 $10,000 Not Implemented
UU0100 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $830 Not Implemented
UU0100 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,490 $165 Not Implemented
UU0100 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $740 Not Implemented
UU0100 # 05 Y:2006 05 2006 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,000 $10,000 Not Implemented
UU0100 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $4,280 $4,140 Not Implemented
WV0340 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $80,134 $2,500 Implemented
WV0340 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $42,375 $27,500 Implemented
WV0340 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,539 $29,343 Not Implemented
WV0340 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $8,729 $2,605 Implemented
WV0340 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,797 $1,520 Not Implemented
WV0340 # 06 Y:2006 06 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,647 $6,520 Not Implemented