Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0311 # 06 Y:2007 | 06 | 2007 | BURN WASTE OIL FOR HEAT | $1,265 | $2,186 | Not Implemented |
MS0311 # 07 Y:2007 | 07 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $385 | $476 | Not Implemented |
OK0741 # 01 Y:2007 | 01 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $144,120 | $500,000 | Not Implemented |
OK0741 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,666 | $860 | Not Implemented |
OK0741 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,334 | $7,480 | Not Implemented |
OK0741 # 04 Y:2007 | 04 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,042 | $6,800 | Not Implemented |
OK0741 # 05 Y:2007 | 05 | 2007 | INSTALL SET-BACK TIMERS | $273 | $248 | Not Implemented |
OR0514 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,300 | $0 | Implemented |
OR0514 # 02 Y:2007 | 02 | 2007 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $135,120 | $4,350 | Not Implemented |
OR0514 # 03 Y:2007 | 03 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,900 | $500 | Not Implemented |
OR0514 # 04 Y:2007 | 04 | 2007 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,400 | $1,000 | Not Implemented |
OR0514 # 05 Y:2007 | 05 | 2007 | DEVELOP STANDARD OPERATING PROCEDURES | $204,000 | $18,800 | Not Implemented |
OR0514 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $500 | $7,700 | Implemented |
OR0514 # 07 Y:2007 | 07 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $16,800 | $11,500 | Not Implemented |
OR0514 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,700 | $0 | Implemented |
OR0514 # 09 Y:2007 | 09 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,900 | $7,400 | Not Implemented |
MA0611 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $98,826 | $74,772 | Implemented |
MA0611 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,486 | $186,840 | Not Implemented |
MA0611 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $23,954 | $17,587 | Implemented |
MA0611 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,443 | $17,876 | Not Implemented |
MA0611 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM TEMPERATURE | $6,194 | $12,675 | Not Implemented |
MA0611 # 06 Y:2007 | 06 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $3,833 | $5,368 | Implemented |
MA0611 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $3,330 | $3,300 | Implemented |
MA0611 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $888 | $6,305 | Not Implemented |
MA0611 # 09 Y:2007 | 09 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $504 | $3,600 | Not Implemented |