IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0487 # 04 Y:2014 04 2014 REDUCE SCRAP PRODUCTION $4,795 $10,700 Implemented
SD0487 # 05 Y:2014 05 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,282 $9,400 Implemented
SD0487 # 06 Y:2014 06 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,473 $2,350 Implemented
SF0450 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,757 $0 Implemented
SF0450 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,693 $650 Implemented
SF0450 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,874 $19,111 Not Implemented
SF0450 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,675 $77,383 Not Implemented
SF0450 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,062 $12,000 Not Implemented
SF0450 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $2,563 $11,811 Implemented
SD0486 # 01 Y:2014 01 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $75,586 $286,300 Not Implemented
SD0486 # 02 Y:2014 02 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $54,581 $250,000 Not Implemented
SD0486 # 03 Y:2014 03 2014 REDUCE SCRAP PRODUCTION $29,967 $30,993 Not Implemented
SD0486 # 04 Y:2014 04 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,957 $4,985 Not Implemented
SD0486 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,274 $22,000 Not Implemented
SD0486 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,270 $600 Not Implemented
SD0486 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $600 Not Implemented
SF0449 # 01 Y:2014 01 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $660 $280 Implemented
SF0449 # 02 Y:2014 02 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,804 $9,262 Not Implemented
SF0449 # 03 Y:2014 03 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $317 $307 Not Implemented
SF0449 # 04 Y:2014 04 2014 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $28,600 $42,672 Not Implemented
SF0449 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,630 $27,842 Implemented
SF0449 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $2,997 $14,024 Not Implemented
SD0485 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,088 $25,225 Not Implemented
SD0485 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,720 $5,000 Implemented
SD0485 # 03 Y:2014 03 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $25,053 $91,900 Implemented