Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0291 # 05 Y:1986 | 05 | 1986 | INSULATE BARE EQUIPMENT | $2,828 | $4,867 | Implemented |
TN0291 # 06 Y:1986 | 06 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,828 | $375 | Implemented |
TN0291 # 07 Y:1986 | 07 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $557 | $295 | Implemented |
UD0204 # 01 Y:1986 | 01 | 1986 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,358 | $250 | Not Implemented |
UD0204 # 02 Y:1986 | 02 | 1986 | HEAT WATER WITH EXHAUST HEAT | $12,542 | $23,373 | Implemented |
UD0204 # 03 Y:1986 | 03 | 1986 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,103 | $10,000 | Not Implemented |
UD0204 # 04 Y:1986 | 04 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,866 | $31,210 | Implemented |
UD0204 # 05 Y:1986 | 05 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $451 | $331 | Implemented |
UD0204 # 06 Y:1986 | 06 | 1986 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,924 | $1,600 | Not Implemented |
UD0204 # 07 Y:1986 | 07 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $668 | $2,000 | Implemented |
UD0201 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,240 | $0 | Implemented |
UD0201 # 02 Y:1986 | 02 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,035 | $11,000 | Implemented |
UD0201 # 03 Y:1986 | 03 | 1986 | INSULATE BARE EQUIPMENT | $284 | $405 | Not Implemented |
TN0259 # 01 Y:1985 | 01 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,022 | $59,300 | Not Implemented |
TN0259 # 02 Y:1985 | 02 | 1985 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $13,198 | $565 | Implemented |
TN0259 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,946 | $1,000 | Not Implemented |
TN0259 # 04 Y:1985 | 04 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,582 | $0 | Implemented |
TN0259 # 05 Y:1985 | 05 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $997 | $108 | Implemented |
TN0259 # 06 Y:1985 | 06 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $426 | $220 | Not Implemented |
TN0246 # 01 Y:1985 | 01 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $16,970 | $3,350 | Implemented |
TN0246 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,100 | $1,200 | Implemented |
TN0246 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $3,100 | $500 | Not Implemented |
TN0246 # 04 Y:1985 | 04 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,940 | $600 | Implemented |
TN0235 # 01 Y:1984 | 01 | 1984 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $155,565 | $49,200 | Implemented |
TN0235 # 02 Y:1984 | 02 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $17,034 | $300 | Implemented |