IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0048 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $2,710 Not Implemented
MA0048 # 05 Y:1985 05 1985 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,082 $2,095 Not Implemented
MA0048 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,733 $9,000 Not Implemented
MA0043 # 01 Y:1985 01 1985 HEAT WATER WITH EXHAUST HEAT $1,549 $1,473 Not Implemented
MA0043 # 02 Y:1985 02 1985 UPGRADE OBSOLETE EQUIPMENT $2,907 $0 Not Implemented
MA0043 # 03 Y:1985 03 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $68 $60 Not Implemented
MA0043 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $100 Not Implemented
MA0043 # 05 Y:1985 05 1985 OPTIMIZE PLANT POWER FACTOR $993 $2,500 Not Implemented
MA0043 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,590 $500 Implemented
MA0043 # 07 Y:1985 07 1985 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $1,989 $1,700 Not Implemented
MA0045 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $787 $450 Implemented
MA0045 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $756 $750 Implemented
MA0045 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,100 $5,110 Not Implemented
MA0045 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,515 $2,816 Not Implemented
MA0045 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $4,896 $7,546 Not Implemented
MA0045 # 06 Y:1985 06 1985 REPAIR OR REPLACE STEAM TRAPS $661 $500 Implemented
MA0045 # 07 Y:1985 07 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $573 $11 Implemented
MA0045 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $546 $1,329 Not Implemented
MA0045 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $845 $1,100 Implemented
MA0046 # 01 Y:1985 01 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $738 $1,650 Not Implemented
MA0046 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $74 Implemented
MA0046 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,418 $168 Not Implemented
MA0046 # 04 Y:1985 04 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $924 $1,350 Not Implemented
MA0046 # 05 Y:1985 05 1985 OPTIMIZE PLANT POWER FACTOR $776 $1,875 Not Implemented
MA0047 # 01 Y:1985 01 1985 UPGRADE OBSOLETE EQUIPMENT $11,304 $0 Implemented