Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0194 # 02 Y:2000 | 02 | 2000 | INSTALL SKYLIGHTS | $3,443 | $7,000 | Implemented |
NC0194 # 03 Y:2000 | 03 | 2000 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $13,561 | $29,000 | Implemented |
NC0194 # 04 Y:2000 | 04 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $483 | $400 | Not Implemented |
NC0194 # 05 Y:2000 | 05 | 2000 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $29,846 | $20,200 | Implemented |
NC0188 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $600 | $440 | Implemented |
NC0188 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $526 | $1,623 | Not Implemented |
NC0188 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,067 | $6,800 | Not Implemented |
NC0188 # 04 Y:2000 | 04 | 2000 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $2,795 | $1,500 | Not Implemented |
NC0188 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,106 | $500 | Implemented |
NC0188 # 06 Y:2000 | 06 | 2000 | INSTALL COMMON HEADER ON COMPRESSORS | $15,323 | $2,200 | Not Implemented |
NC0188 # 07 Y:2000 | 07 | 2000 | BURN WOOD BY-PRODUCTS FOR HEAT | $3,120 | $0 | Implemented |
NC0188 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $26,287 | $960 | Not Implemented |
NC0190 # 01 Y:2000 | 01 | 2000 | ADJUST BURNERS FOR EFFICIENT OPERATION | $16,521 | $3,000 | n/a |
NC0190 # 02 Y:2000 | 02 | 2000 | KEEP BOILER TUBES CLEAN | $16,531 | $15,000 | n/a |
NC0190 # 03 Y:2000 | 03 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $163 | $300 | n/a |
NC0190 # 04 Y:2000 | 04 | 2000 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $19,521 | $8,000 | n/a |
NC0190 # 05 Y:2000 | 05 | 2000 | DISCONNECT BALLASTS | $2,180 | $1,800 | n/a |
NC0190 # 06 Y:2000 | 06 | 2000 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $202,493 | $450,000 | n/a |
NC0190 # 07 Y:2000 | 07 | 2000 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $76,945 | $200,000 | n/a |
NC0186 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,878 | $20 | Not Implemented |
NC0186 # 02 Y:2000 | 02 | 2000 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $3,993 | $6,400 | Not Implemented |
NC0186 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM THICKNESS INSULATION | $9,327 | $32,175 | Not Implemented |
NC0186 # 04 Y:2000 | 04 | 2000 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $12,321 | $4,000 | Implemented |
NC0186 # 05 Y:2000 | 05 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,150 | $200 | Not Implemented |
NC0191 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,005 | $1,000 | Implemented |