Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0369 # 11 Y:2008 | 11 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,687 | $1,000 | Implemented |
WV0369 # 12 Y:2008 | 12 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,264 | $2,000 | Implemented |
WV0369 # 13 Y:2008 | 13 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,047 | $776 | Implemented |
WV0369 # 14 Y:2008 | 14 | 2008 | INSULATE BARE EQUIPMENT | $2,008 | $1,241 | Implemented |
WV0369 # 15 Y:2008 | 15 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,004 | $87 | Not Implemented |
WV0369 # 16 Y:2008 | 16 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,266 | $114 | Implemented |
WV0369 # 17 Y:2008 | 17 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $835 | $0 | Implemented |
WV0369 # 18 Y:2008 | 18 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $819 | $1,484 | Not Implemented |
WV0369 # 19 Y:2008 | 19 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $563 | $585 | Implemented |
WV0369 # 20 Y:2008 | 20 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $389 | $470 | Implemented |
LE0267 # 01 Y:2008 | 01 | 2008 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $198,263 | $200,000 | Not Implemented |
LE0267 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $41,140 | $6,000 | Implemented |
LE0267 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,169 | $30,000 | Implemented |
LE0267 # 04 Y:2008 | 04 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $31,944 | $2,000 | Implemented |
LE0267 # 05 Y:2008 | 05 | 2008 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $21,795 | $30,000 | Not Implemented |
LE0267 # 06 Y:2008 | 06 | 2008 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $26,495 | $31,435 | Not Implemented |
LE0267 # 07 Y:2008 | 07 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,200 | $3,000 | Implemented |
LE0267 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,134 | $1,500 | Not Implemented |
LE0267 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,723 | $1,000 | Implemented |
LE0267 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,129 | $300,000 | Implemented |
LE0266 # 01 Y:2008 | 01 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $42,137 | $2,614 | Implemented |
LE0266 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,436 | $1,860 | Not Implemented |
LE0266 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,346 | $1,000 | Not Implemented |
LE0266 # 04 Y:2008 | 04 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,847 | $400 | Not Implemented |
LE0266 # 05 Y:2008 | 05 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,436 | $2,500 | Not Implemented |