Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0354 # 08 Y:2008 | 08 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $496 | $2,215 | Not Implemented |
UD0777 # 01 Y:2008 | 01 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $621,360 | $28,800 | Not Implemented |
UD0777 # 02 Y:2008 | 02 | 2008 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $468,137 | $140,000 | Not Implemented |
UD0777 # 03 Y:2008 | 03 | 2008 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $86,400 | $85,000 | Not Implemented |
UD0777 # 04 Y:2008 | 04 | 2008 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $70,469 | $40,000 | Implemented |
UD0777 # 05 Y:2008 | 05 | 2008 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $45,421 | $74,873 | Not Implemented |
UD0777 # 06 Y:2008 | 06 | 2008 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $35,664 | $50,000 | Implemented |
UD0777 # 07 Y:2008 | 07 | 2008 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $35,347 | $15,000 | Implemented |
UD0777 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,252 | $1,000 | Implemented |
UD0777 # 09 Y:2008 | 09 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,821 | $1,900 | Not Implemented |
UD0777 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,188 | $28,755 | Not Implemented |
UD0777 # 11 Y:2008 | 11 | 2008 | USE MINIMUM STEAM OPERATING PRESSURE | $7,900 | $0 | Not Implemented |
UD0777 # 12 Y:2008 | 12 | 2008 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $8,318 | $19,000 | Implemented |
UD0777 # 13 Y:2008 | 13 | 2008 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,240 | $0 | Implemented |
UD0777 # 14 Y:2008 | 14 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,509 | $3,815 | Implemented |
UD0777 # 15 Y:2008 | 15 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $1,436 | $0 | Not Implemented |
UF0409 # 01 Y:2008 | 01 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,798 | $16,755 | Not Implemented |
UF0409 # 02 Y:2008 | 02 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $8,549 | $1,248 | Implemented |
UF0409 # 03 Y:2008 | 03 | 2008 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $349 | $29 | Implemented |
UF0409 # 04 Y:2008 | 04 | 2008 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,156 | $20,960 | Not Implemented |
UF0409 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $764 | $2,390 | Implemented |
UF0409 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,158 | $1,870 | Implemented |
UF0409 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,082 | $24,230 | Not Implemented |
UF0409 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,400 | $10,830 | Not Implemented |
UF0409 # 09 Y:2008 | 09 | 2008 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $17,491 | $25,340 | Not Implemented |