Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,184
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0321 # 07 Y:1999 | 07 | 1999 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $1,031 | $3,000 | Not Implemented |
ND0321 # 08 Y:1999 | 08 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $730 | $125 | Implemented |
ND0321 # 09 Y:1999 | 09 | 1999 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $203 | $203 | Not Implemented |
ND0321 # 10 Y:1999 | 10 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $158 | $130 | Implemented |
ND0321 # 11 Y:1999 | 11 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $137 | $195 | Not Implemented |
ND0322 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $639 | $1,458 | Not Implemented |
ND0322 # 02 Y:1999 | 02 | 1999 | USE OPTIMUM TEMPERATURE | $161 | $0 | Implemented |
ND0322 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,357 | $1,250 | Not Implemented |
ND0322 # 04 Y:1999 | 04 | 1999 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $2,056 | $38,197 | Not Implemented |
ND0322 # 05 Y:1999 | 05 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,625 | $4,000 | Not Implemented |
ND0322 # 06 Y:1999 | 06 | 1999 | CONVERT TO AQUEOUS CLEANING SYSTEM | $65 | $20 | Not Implemented |
UM0141 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,742 | $910 | Implemented |
UM0141 # 02 Y:1999 | 02 | 1999 | INSTALL SKYLIGHTS | $11,263 | $38,792 | Not Implemented |
UM0141 # 03 Y:1999 | 03 | 1999 | USE RADIANT HEATER FOR SPOT HEATING | $29,633 | $82,875 | Not Implemented |
UM0141 # 04 Y:1999 | 04 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,664 | $3,750 | Implemented |
UM0141 # 05 Y:1999 | 05 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $7,277 | $0 | Implemented |
UM0141 # 06 Y:1999 | 06 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $126,000 | $50,000 | Implemented |
UM0140 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,168 | $780 | Not Implemented |
UM0140 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,110 | $600 | Not Implemented |
UM0140 # 03 Y:1999 | 03 | 1999 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $27,426 | $13,000 | Not Implemented |
UM0140 # 04 Y:1999 | 04 | 1999 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,688 | $3,600 | Not Implemented |
UM0140 # 05 Y:1999 | 05 | 1999 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $225,811 | $90,000 | Not Implemented |
UM0140 # 06 Y:1999 | 06 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,613 | $0 | Not Implemented |
UM0140 # 07 Y:1999 | 07 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $36,686 | $0 | Not Implemented |
UM0139 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,007 | $450 | Implemented |