Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0207 # 01 Y:2011 | 01 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $123,852 | $137,314 | Not Implemented |
MI0207 # 02 Y:2011 | 02 | 2011 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $76,417 | $150,000 | Not Implemented |
MI0207 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $61,926 | $2,550 | Implemented |
MI0207 # 04 Y:2011 | 04 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $33,207 | $8,474 | Not Implemented |
MI0207 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,901 | $1,320 | Implemented |
MI0207 # 06 Y:2011 | 06 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,650 | $9,200 | Not Implemented |
MI0206 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,265 | $37,814 | Implemented |
MI0206 # 02 Y:2011 | 02 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,476 | $44,779 | Implemented |
MI0206 # 03 Y:2011 | 03 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,977 | $2,300 | Implemented |
MI0206 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,348 | $50 | Implemented |
MI0206 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,064 | $1,320 | Implemented |
MI0206 # 06 Y:2011 | 06 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,757 | $2,400 | Implemented |
MI0206 # 07 Y:2011 | 07 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,108 | $4,771 | Implemented |
MI0205 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,634 | $38,332 | Not Implemented |
MI0205 # 02 Y:2011 | 02 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,973 | $1,984 | Not Implemented |
MI0205 # 03 Y:2011 | 03 | 2011 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $4,980 | $18,280 | Not Implemented |
MI0205 # 04 Y:2011 | 04 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,662 | $17,186 | Not Implemented |
MI0205 # 05 Y:2011 | 05 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,114 | $2,500 | Implemented |
MI0205 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,412 | $1,320 | Not Implemented |
MI0204 # 01 Y:2011 | 01 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $18,841 | $46,645 | Not Implemented |
MI0204 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,475 | $1,320 | Implemented |
MI0204 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,367 | $2,550 | Implemented |
MI0204 # 04 Y:2011 | 04 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,856 | $9,183 | Not Implemented |
MI0204 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,117 | $9,600 | Not Implemented |
MI0204 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,875 | $50 | Implemented |