Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,529
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0608 # 07 Y:1997 | 07 | 1997 | USE GRAVITY FEEDS WHEREVER POSSIBLE | $2,568 | $14,250 | Not Implemented |
GT0608 # 08 Y:1997 | 08 | 1997 | DISCONNECT BALLASTS | $552 | $84 | Implemented |
GT0608 # 09 Y:1997 | 09 | 1997 | MAINTAIN MACHINES TO REDUCE LEAKS | $6,500 | $5,000 | Not Implemented |
GT0608 # 10 Y:1997 | 10 | 1997 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $2,500 | $9,400 | Implemented |
GT0607 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,960 | $62,150 | Implemented |
GT0607 # 02 Y:1997 | 02 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,502 | $5,320 | Not Implemented |
GT0607 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,568 | $29,830 | Implemented |
GT0607 # 04 Y:1997 | 04 | 1997 | METER WASTE WATER | $580 | $0 | Not Implemented |
GT0607 # 05 Y:1997 | 05 | 1997 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $90,000 | $21,000 | Implemented |
GT0607 # 06 Y:1997 | 06 | 1997 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,086 | $15,000 | Implemented |
GT0607 # 07 Y:1997 | 07 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,924 | $13,000 | Implemented |
GT0607 # 08 Y:1997 | 08 | 1997 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $30,229 | $18,000 | Implemented |
GT0597 # 01 Y:1996 | 01 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $9,934 | $5,000 | Not Implemented |
GT0597 # 02 Y:1996 | 02 | 1996 | OPERATE BOILERS ON HIGH FIRE SETTING | $8,380 | $2,000 | Not Implemented |
GT0597 # 03 Y:1996 | 03 | 1996 | MINIMIZE WATER USAGE | $62,640 | $0 | Not Implemented |
GT0597 # 04 Y:1996 | 04 | 1996 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,570 | $75,450 | Not Implemented |
GT0597 # 05 Y:1996 | 05 | 1996 | INSTALL COMMON HEADER ON COMPRESSORS | $29,270 | $96,000 | Not Implemented |
GT0597 # 06 Y:1996 | 06 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,760 | $48,450 | Not Implemented |
GT0605 # 01 Y:1996 | 01 | 1996 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,246 | $675 | Implemented |
GT0605 # 02 Y:1996 | 02 | 1996 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,110 | $3,500 | Implemented |
GT0605 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,308 | $103 | Implemented |
GT0605 # 04 Y:1996 | 04 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,090 | $1,450 | Implemented |
GT0605 # 05 Y:1996 | 05 | 1996 | METER WASTE WATER | $14,720 | $0 | Implemented |
GT0605 # 06 Y:1996 | 06 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,120 | $4,300 | Implemented |
GT0605 # 07 Y:1996 | 07 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,000 | $4,908 | Implemented |