IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0107 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,159 $500 Not Implemented
RU0107 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $217 $59 Not Implemented
RU0107 # 06 Y:1991 06 1991 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $78,180 $0 Not Implemented
KU0333 # 01 Y:1991 01 1991 REDESIGN PROCESS $1,119 $0 Implemented
KU0333 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,551 $3,600 Implemented
KU0333 # 03 Y:1991 03 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,970 $20,000 Implemented
KU0333 # 04 Y:1991 04 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,825 $4,000 Implemented
KU0333 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $153 $0 Implemented
KU0333 # 06 Y:1991 06 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,398 $200 Implemented
KU0333 # 07 Y:1991 07 1991 INSTALL SET-BACK TIMERS $698 $1,000 Implemented
KU0333 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85 $84 Implemented
MA0203 # 01 Y:1991 01 1991 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $13,019 $8,029 Implemented
MA0203 # 02 Y:1991 02 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $7,245 $2,182 Implemented
MA0203 # 03 Y:1991 03 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $778 $547 Implemented
MA0203 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,651 $32,018 Implemented
MA0203 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $642 $161 Implemented
MA0204 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,629 $0 Not Implemented
MA0204 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $12,296 $3,400 Not Implemented
MA0204 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,632 $46,085 Not Implemented
MA0204 # 04 Y:1991 04 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,064 $11,160 Not Implemented
MA0204 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,027 $31,600 Not Implemented
MA0204 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $48 Not Implemented
OR0107 # 01 Y:1991 01 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,299 $0 Implemented
OR0107 # 02 Y:1991 02 1991 RECOVER AND REUSE COOLING WATER $123,679 $0 Implemented
OR0107 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,674 $10,500 Implemented