IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0216 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $154 $760 Not Implemented
ND0216 # 09 Y:1995 09 1995 RECOVER AND REUSE WASTE MATERIAL $1,920 $0 Not Implemented
KG0030 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,705 $19,230 Implemented
KG0030 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,534 $2,850 Implemented
KG0030 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $7,624 $2,518 Implemented
KG0030 # 04 Y:1995 04 1995 AIR CONDITION ONLY SPACE NECESSARY $3,434 $5,070 Implemented
KG0030 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,427 $780 Implemented
KG0030 # 06 Y:1995 06 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,297 $750 Not Implemented
KG0030 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $664 $1,500 Not Implemented
DS0029 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,278 $16,954 Not Implemented
DS0029 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $132 $380 Not Implemented
DS0029 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $783 $1,350 Implemented
DS0029 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $53 $120 Implemented
DS0029 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $689 $2,805 Implemented
DS0029 # 06 Y:1995 06 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $5,845 $7,342 Not Implemented
AR0056 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $371 $150 Implemented
AR0056 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $715 $190 Implemented
AR0056 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,074 $150 Implemented
AR0056 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,031 $364 Implemented
AR0056 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,153 $8,990 Implemented
AR0055 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,899 $4,070 Implemented
AR0055 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $481 $347 Implemented
AR0055 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $185 $0 Implemented
AR0055 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $259 $200 Implemented
AR0055 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $451 $30 Implemented