IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0443 # 04 Y:2014 04 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $21,679 $25,614 Implemented
SF0443 # 05 Y:2014 05 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $57,826 $69,335 Not Implemented
SF0443 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,897 $24,840 Not Implemented
SF0443 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,886 $16,744 Not Implemented
SF0443 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $9,060 $45,537 Not Implemented
SF0443 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $63,378 $31,000 Implemented
SF0443 # 10 Y:2014 10 2014 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $11,793 $50,140 Not Implemented
SF0443 # 11 Y:2014 11 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $67,869 $444,663 Not Implemented
SF0442 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,021 $0 Implemented
SF0442 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,864 $2,722 Implemented
SF0442 # 03 Y:2014 03 2014 ADD AREA LIGHTING SWITCHES $409 $252 Not Implemented
SF0442 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,082 $12,459 Implemented
SF0442 # 05 Y:2014 05 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $231 $1,559 Implemented
SF0442 # 06 Y:2014 06 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $14,162 $173,094 Not Implemented
SD0478 # 01 Y:2014 01 2014 REDUCE SCRAP PRODUCTION $30,811 $12,465 Implemented
SD0478 # 02 Y:2014 02 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,342 $32,990 Not Implemented
SD0478 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,128 $500 Implemented
SD0478 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $2,630 $2,535 Implemented
SD0478 # 05 Y:2014 05 2014 USE PHOTOCELL CONTROLS $2,220 $4,625 Implemented
OR0623 # 01 Y:2013 01 2013 MODIFY STARTUP/SHUTDOWN TIMES $7,500 $700 Not Implemented
OR0623 # 02 Y:2013 02 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,199 $1,260 Not Implemented
OR0623 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $6,693 $1,500 Implemented
OR0623 # 04 Y:2013 04 2013 MODIFY STARTUP/SHUTDOWN TIMES $2,617 $2,500 Not Implemented
OR0623 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $8,023 $9,452 Not Implemented
OR0623 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,460 $11,957 Not Implemented