IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,776

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0518 # 02 Y:1994 02 1994 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $10,859 $13,300 Not Implemented
TN0518 # 03 Y:1994 03 1994 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $11,508 $5,200 Not Implemented
TN0518 # 04 Y:1994 04 1994 INSTALL TIMERS AND/OR THERMOSTATS $7,597 $5,400 Not Implemented
TN0518 # 05 Y:1994 05 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,005 $360 Not Implemented
TN0518 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $6,176 $605 Not Implemented
TN0518 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,013 $200 Implemented
TN0518 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $108 Implemented
TN0514 # 01 Y:1994 01 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $28,698 $23,000 Implemented
TN0514 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $6,641 $2,168 Implemented
TN0514 # 03 Y:1994 03 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $3,001 $1,750 Implemented
TN0514 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,643 $2,700 Implemented
TN0514 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,520 $0 Not Implemented
TN0512 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,901 $840 Implemented
TN0512 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,241 $620 Not Implemented
TN0512 # 03 Y:1994 03 1994 USE SYNTHETIC LUBRICANT $3,076 $0 Not Implemented
TN0512 # 04 Y:1994 04 1994 INSTALL TIMERS AND/OR THERMOSTATS $997 $1,100 Not Implemented
TN0512 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $450 $280 Not Implemented
TN0512 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $5,590 $6,000 Not Implemented
TN0528 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $15,187 $6,700 n/a
TN0528 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,236 $4,060 n/a
TN0528 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $1,967 $365 n/a
TN0528 # 04 Y:1994 04 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $858 $0 n/a
TN0528 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $715 $0 n/a
TN0528 # 06 Y:1994 06 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $572 $330 n/a
TN0528 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $275 n/a