IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0399 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $11,080 $23,750 Implemented
UD0399 # 03 Y:1993 03 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,749 $23,750 Implemented
AS0084 # 01 Y:1993 01 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,468 $3,050 Not Implemented
AS0084 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122 $238 Implemented
AS0084 # 03 Y:1993 03 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $331 $1,500 Not Implemented
AS0084 # 04 Y:1993 04 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,723 $0 Implemented
AS0084 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $240 $83 Implemented
AS0084 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,618 $1,900 Not Implemented
AS0084 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $1,285 $900 Not Implemented
AS0084 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $600 Not Implemented
MA0270 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $3,971 $4,811 Implemented
MA0270 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,894 $0 Implemented
MA0270 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,507 $390 Implemented
MA0270 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,159 $400 Implemented
MA0270 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $972 $0 Not Implemented
MA0270 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $899 $372 Not Implemented
MA0270 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $496 $1,227 Not Implemented
MA0270 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $176 Not Implemented
OK0402 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $4,508 Implemented
OK0402 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,470 $18,084 Not Implemented
OK0402 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $1,100 Implemented
OK0402 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $379 $438 Not Implemented
SD0056 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,009 $978 Implemented
SD0056 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,029 $300 Not Implemented
SD0056 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,097 $0 Implemented